8 Commissioning
3 Start the pump test run operation (see
run" [ 4  26]).
actuator test
4 Go to [6.1.8]:
> Information > Sensor information >
Flow
rate to check the flow rate. During pump test run
operation, the unit can operate below this minimum required
flow rate.
Minimum required flow rate
12 l/min
8.2.2

To perform an air purge

Prerequisite: Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1 Go to [A.7.3]:
> Installer settings > Commissioning >
Air purge.
2 Set the type.
3 Select Start air purge and press
4 Select OK and press
.
Result: The air purge starts. It stops automatically when done. To
stop it manually, press
, select OK and press
Air purging heat emitters or collectors
We recommend to purge air with the unit's air purge function (see
above). However, if you purge air from the heat emitters or
collectors, mind the following:
WARNING
Air purging heat emitters or collectors. Before you
purge air from heat emitters or collectors, check if an error
or
is displayed on the home pages of the user interface.
▪ If not, you can purge air immediately.
▪ If yes, make sure that the room where you want to
purge air is sufficiently ventilated. Reason: Refrigerant
might leak into the water circuit, and subsequently into
the room when you purge air from the heat emitters or
collectors.
8.2.3

To perform a test run

Prerequisite: Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1 Set the user permission level to Installer. See
Installer" [ 4  18].
permission level to
2 Go to [A.7.1]:
> Installer settings > Commissioning >
Test run.
3 Select a test and press
. Example: Heating.
4 Select OK and press
.
Result: The test run starts. It stops automatically when done
(±30 min). To stop it manually, press
INFORMATION
If 2 user interfaces are present, you can start a test run
from both user interfaces.
▪ The user interface used to start the test run displays a
status screen.
▪ The other user interface displays a "busy" screen. You
cannot use the user interface as long as the "busy"
screen is shown.
Installation manual
26
"8.2.4  To perform an
.
.
"To set the user
, select OK and press
.
8.2.4

To perform an actuator test run

Perform an actuator test run to confirm the operation of the different
actuators. For example, when you select Pump, a test run of the
pump will start.
Prerequisite: Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1 Set the user permission level to Installer. See
Installer" [ 4  18].
permission level to
2 Go to [A.7.4]:
> Installer settings > Commissioning >
Actuator test run.
3 Select an actuator and press
4 Select OK and press
.
Result: The actuator test run starts. It automatically stops when
finished. To stop it manually, press
Possible actuator test runs
▪ Backup heater (step 1) test
▪ Pump test
INFORMATION
Make sure that all air is purged before executing the test
run. Also avoid disturbances in the water circuit during the
test run.
▪ Solar pump test
▪ Shut-off valve test
▪ 3-way valve test
▪ Bivalent signal test
▪ Alarm output test
▪ H/C signal (heating/cooling signal) test
▪ Quick heatup test
▪ DHW pump test
8.2.5
To perform an underfloor heating screed
dryout
Prerequisite: Make sure there is only 1 user interface connected to
your system to perform an underfloor heating screed dryout.
Prerequisite: Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1 Go to [A.7.2]:
> Installer settings > Commissioning >
UFH screed dryout.
2 Set a dryout program.
3 Select Start dryout and press
4 Select OK and press
.
Result: The underfloor heating screed dryout starts. It stops
automatically when done. To stop it manually, press
and press
.
NOTICE
To perform an underfloor heating screed dryout, room frost
protection needs to be disabled ([2‑06]=0). By default, it is
enabled ([2‑06]=1). However, due to the "installer-on-site"
mode (see "Commissioning"), room frost protection will be
automatically disabled for 36 hours after the first power-on.
If the screed dryout still needs to be performed after the
first 36 hours of power-on, manually disable room frost
protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will
result in cracking of the screed.
"To set the user
. Example: Pump.
, select OK and press
.
.
, select OK
EHFH03S18D
Daikin Altherma 3 R F
4P596803-1D – 2022.08