Download Print this page

Samsung MOK-100LA Installation Manual page 9

Advertisement

3. Assemble the control box and the control kit.
<Control box specification determinants>
• The control kit must be taken into the
control box. (Check the fitting holes.)
• The UL certification must be acquired.
• When the louver actuator shaft enters into
the box, prevent water penetration. (Use a
bushing and such.)
• When assembling the control kit, use the
boss with12 mm or above in size.
(The heat transfer distance between the
control kit and control box must be 12 mm
or above.)
4. Assemble the damper and Assy control box.
LOUVER
SHAFT
WARNING
• When assembling the damper and Assy control box, be sure to fix the shaft and actuator (Nut x2)
in the louver in fully open state.
DB68-06398A-01_IM_ACC 옵션 저온냉방 Kit_AA_EN_.indd 9
DB68-06398A-01_IM_ACC 옵션 저온냉방 Kit_AA_EN_.indd 9
8
13 /
16
7
5 /
8
2
FULL OPEN
NUT
Louver
SCREW X 4 EA
3
1 /
2
Damper
2022-09-08 오후 1:53:03
2022-09-08 오후 1:53:03
9

Advertisement

loading