Electrical Wiring With Valve Seal Control (Dungs Vps 504); 5.12.4 Ionisation Current - Riello 40 GS10D Installation, Use And Maintenance Instructions

Forced draught gas burner
Table of Contents

Advertisement

5.12.3 Electrical wiring with valve seal control
(DUNGS VPS 504)
Key (Fig. 19)
B4
1st stage operating signal
B5
2nd stage operating signal
h1
1st stage hour counter
h2
2nd stage hour counter
PG
Min. gas pressure switch
S3
Remote lock-out signal (230V - 0.5A max.)
T6A
Fuse
TL
Limit thermostat
TR
2nd stage thermostat
TS
Safety thermostat
VPS
Valve leak detection control
V10
Safety valve
V11
1st stage valve
V11
2nd stage valve
X4
4-pin plug
X6
6 pin plug
X7
7 pin plug
Installation
D4148

5.12.4 Ionisation current

The minimum current necessary for the control box operation is
3 µA. The burner normally supplies a higher current value, so that
no control is needed. Anyway, if you want to measure the ionisa-
tion current, you need to open the connector (CN1)(Fig. 18) on
the red wire and insert a microammeter as shown in Fig. 20.
Control box
D5006
21
GB
*
*
Connect the 2nd stage thermo-
stat between terminals T6 and
T8, removing the bridge.
Connector
Fig. 19
Probe
Fig. 20
20063795

Advertisement

Table of Contents
loading

This manual is also suitable for:

576t13757615

Table of Contents