Electrical Wiring With Valve Seal Control (Dungs Vps 504) - Riello 40 FS5D Installation, Use And Maintenance Instructions

Forced draught gas burner, two stage operation
Table of Contents

Advertisement

5.11.4 Electrical wiring with valve seal control
(DUNGS VPS 504)
Key (Fig. 19)
B5
Operation signal 2nd stage
h1
1st stage hour counter
h2
2nd stage hour counter
PG
Min. gas pressure switch
S3
Remote lock-out signal (230V - 0.5A max.)
T6A
Fuse
TL
Limit thermostat
TR
2nd stage thermostat
TS
Safety thermostat
VPS
Valve leak detection control
V10
Safety valve
V11
1st stage valve
V12
2nd stage valve
X4
4-pin plug
X6
6 pin plug
X7
7 pin plug
Installation
21
GB
D4371
Fig. 19
20146103

Advertisement

Table of Contents
loading

This manual is also suitable for:

587m

Table of Contents