Download Print this page

ZyXEL Communications Q1000z Quick Start Manual page 9

Advertisement

3. Be careful to avoid damaging pipes or cables located inside the wall
when drilling holes for the screws.
4. Do not insert the screws all the way into the wall. Leave a small gap of
about 0.5 cm between the heads of the screws and the wall.
5. Make sure the screws are snugly fastened to the wall. They need to
hold the weight of the Q1000Z with the connection cables.
6. Align the holes on the back of the Q1000Z with the screws on the
wall. Hang the Q1000Z on the screws.
9

Advertisement

loading