Download Print this page

Dialight Vigilant Operation & Installation Instructions page 4

Area light with battery backup

Advertisement

4. Collect the replacement battery pack and slide into the battery enclosure as shown. Align the two 10-32
captive screws already in the pack with the two corresponding holes in the enclosure.
Torque to 28-30 in-lbs
Figure A
5. Connect battery pack to battery driver as shown.
Page
4
Area Light with Battery Backup UL1598/A / UL844 / UL924
Figure B
Dialight, 1501 Route 34 South, Farmingdale, NJ, USA 07727
Tel: 732 919 3119
Fax: 732 751 5778
9100HZC280501 REV B
www.dialight.com

Advertisement

loading

This manual is also suitable for:

SafesiteAlu5bc27dgnngnAlu5bc27nnwngnAlu5bc29nnwngn