Waeco AirCon Service Center BMW 2500G Operating Manual page 93

Air conditioning service unit
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 71
BMW 2500G
10. Decide whether a UV medium should be added when filling up or
not.
The standard filling quantity is 7 ml. This quantity is subject to
change (see chapter "Editing default values" on page 86).
Press ENTER to confirm.
11. Use the cursor keys  or  to select whether the air conditioning
system has two connections (high pressure and low pressure) or
one connection (high pressure or low pressure).
Press ENTER to confirm.
12. Select whether after the filling process a trial run of the air condition-
ing unit should be carried out or not.
Press ENTER to confirm.
✓ The fully automatic air conditioning service is started.
✓ After the air conditioning service has finished, you will be prompted to
disconnect the hoses (11) and (12) of the AirCon Service Center from
the vehicle air conditioning system.
13. Disconnect the service hoses (11) and (12) and press ENTER to
confirm.
The service hoses will now be drained. The device is then ready for
further use.
14. Put the valve caps of the vehicle air conditioning system back on the
connections.
EN
WARNING !
UV-Tracer injection
phase?
HP/LP PORT
HP PORT
LP PORT
ENTER-OK STOP-EXIT
A/C System test
at the end?
Operation
Yes
No
Yes
No
93

Advertisement

Table of Contents
loading

Table of Contents