Waeco AirCon Service Center BMW 2500G Operating Manual page 90

Air conditioning service unit
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 71
Initial start-up
5. Then follow the instructions in the display and provided here:
Press ENTER to confirm.
The maximum refrigerant quantity which can be added appears in
the display.
Enter the required amount and press ENTER to confirm.
The internal refrigerant container is filled.
When the filling process is finished, this will be confirmed by an
acoustic signal.
Close the valves and press ENTER to confirm.
6. After filling, the quantity of refrigerant in the internal container is dis-
played. Press STOP to exit the menu.
Press STOP again to access the standby menu.
The device is now ready for operation.
90
Connect the HP hose
to the external tank
then open the valve
ENTER-OK STOP-EXIT
Set the quantity
then confirm!
ENTER-OK
STOP-EXIT
g.
13620
BMW 2500G
EN

Advertisement

Table of Contents
loading

Table of Contents