SEC/SH/06/23/DC2 * Use of power tools to assemble this product will invalidate * Please check contents and read the instructions before commencing assembly. any claim and damage this product making it unsafe !!! * Assemble this product following the enclosed instructions carefully. * Please assemble on a clean soft surface to avoid damage.
SEC/SH/06/23/DC3 FITTINGS SPACER (WOODEN) Ø8 x 50mm 3,5 x 35mm Ø7 x 100mm Ø4,0 x 35mm Ø10 x 50mm Ø7 x 50mm Ø10 x 100mm Ø4,0 x 25mm TOOLS REQUIRED Page 03...
Page 4
SEC/SH/06/23/DC3 STEP 1 PARTS REQUIRED HEADBOARD PANEL HARDWARE REQUIRED Ø8 x 50mm TOOLS REQUIRED Please assemble on Glue must be added a clean soft surface to the dowel holes on to avoid damage. part 01. STEP 2 BLUE PARTS REQUIRED Ø7 x 100mm HEADBOARD PANEL LEFT POST (BOTTOM) (YELLOW)
Page 5
SEC/SH/06/23/DC3 STEP 3 PARTS REQUIRED Ø7 x 100mm HEADBOARD PANEL UPPER LEFT/GUARD RAIL (GREY) Ø7 x 50mm UPPER RIGHT/GUARD RAIL (RED) HARDWARE REQUIRED Ø8 x 50mm 17mm Ø7 x 100mm TOOLS REQUIRED Please assemble on Glue must be added a clean soft surface to the dowel holes on to avoid damage.
Page 6
SEC/SH/06/23/DC3 STEP 5 PARTS REQUIRED SIDE RAIL (LADDER HOLES) SIDE RAIL SIDE RAIL (SUPPORT BRACE HOLES) HARDWARE REQUIRED Ø8 x 50mm TOOLS REQUIRED STEP 6 PARTS REQUIRED LONG SAFETY RAIL SHORT SAFETY RAIL HARDWARE REQUIRED Ø8 x 50mm TOOLS REQUIRED Page 06...
Page 7
SEC/SH/06/23/DC3 STEP 7 BLUE PARTS REQUIRED SIDE RAIL (LADDER HOLES) Ø7 x 100mm YELLOW SIDE RAIL Ø7 x 50mm YELLOW BLUE HARDWARE REQUIRED 17mm TOOLS REQUIRED STEP 8 PARTS REQUIRED BOTTOM HEADBOARD PLINTH HARDWARE REQUIRED TOOLS REQUIRED Glue must be added to the dowel holes on part 04.
Page 8
SEC/SH/06/23/DC3 STEP 9 PARTS REQUIRED Ø7 x 100mm SIDE RAIL SIDE RAIL (SUPPORT BRACE HOLES) NATURAL LONG SAFETY RAIL Ø7 x 50mm HARDWARE REQUIRED 17mm 17mm Ø7 x 100mm TOOLS REQUIRED STEP 10 PARTS REQUIRED 08 - TOP HEADBOARD PLINTH HARDWARE REQUIRED TOOLS REQUIRED Glue must be added...
Page 9
SEC/SH/06/23/DC3 STEP 11 PARTS REQUIRED 16 - SLATS HARDWARE REQUIRED SPACER (WOODEN) 3,5 x 35mm TOOLS REQUIRED STEP 12 PARTS REQUIRED 16 - SLATS HARDWARE REQUIRED SPACER (WOODEN) 3,5 x 35mm TOOLS REQUIRED Page 09...
SEC/SH/06/23/DC3 STEP 13 PARTS REQUIRED HARDWARE REQUIRED Ø4,0 x 35mm Ø10 x 100mm TOOLS REQUIRED Page 10...
Page 11
SEC/SH/06/23/DC3 STEP 14 ADD GLUE TO THE DOWEL HOLES! PARTS REQUIRED LONG LADDER UPRIGHT SHORT LADDER UPRIGHT LADDER STEP HARDWARE REQUIRED ADD GLUE TO BOTH DOWEL HOLES! Ø10 x 50mm Ø4,0 x 25mm TOOLS REQUIRED ADD GLUE AS ABOVE! Page 11...
Page 12
SEC/SH/06/23/DC3 STEP 15 PARTS REQUIRED Ø7 x 100mm Ø7 x 50mm HARDWARE REQUIRED 17mm Ø7 x 50mm TOOLS REQUIRED STEP 16 PARTS REQUIRED Ø7 x 100mm SHORT SAFETY RAIL Ø7 x 50mm HARDWARE REQUIRED 17mm Ø7 x 100mm 17mm Ø7 x 50mm TOOLS REQUIRED Page 12...
Page 13
SEC/SH/06/23/DC3 STEP 17 PARTS REQUIRED SUPPORT BRACE WITH HOLE SUPPORT BRACE HARDWARE REQUIRED Ø4,0 x 35mm TOOLS REQUIRED STEP 18 100KG PARTS REQUIRED TOP BUNK HARDWARE REQUIRED MAX WEIGHT TOOLS REQUIRED 100KG BOTTOM BUNK MAX WEIGHT Page 13...
Need help?
Do you have a question about the NEPTUNE SEC/SH/06/23/DC3 and is the answer not in the manual?