Start-Up & Performance Check List
2
1
GAS SUPPLY
1
Natural Gas
Piping Connections Tight
Leak Tested
Supply Line Pressure " W.C.________
VENT / EXHAUST PIPE
2
Secure to Unit
Elbows Secured to Pipe
Roof Flashing (water tight)
Vent Pipe Supported
Unit Model Number_______________
Serial Number___________________
2
Gas Supply Pressure
1
LP/Propane Gas
UNIT SET UP
(typical)
SUPPLY
AIR
Line Voltage
5
4
DUCT SYSTEM
3
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
Registers Open and Unobstructed
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
INTEGRATED CONTROL
4
DIP Switches Set (if applicable)
Appropriate Links in Place (if applicable)
VOLTAGE CHECK
5
Supply Voltage _____
Electrical Connections Tight
Page 31
upflow furnace shown
3
Filter
RETURN
RETURN
AIR
AIR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merit series

Table of Contents