OWNER' S RECOMMENDED MAINTENANCE

Legend:
Daily
Operator
Maintenance Schedule
Task
1.
Make sure CO
cylinder regulator assembly
2
1800--psi gage indicator is not in shaded (' ' change
CO
cylinder' ' ) portion of dial. If so, CO
2
almost empty and must be replaced.
2.
CO
regulators should be checked for proper pres-
2
sure settings periodically and adjusted as instructed.
3.
The carbonator tank liquid level (40 to 60-ounces)
pump cut--in and cut--out were adjusted at the
factory and should require no further adjustment. If
incorrect adjustment is suspected, call a Service
Person.
4.
Syrup systems should be sanitized every 90-days
following Sanitizer Manufacturer' s recommendations
as instructed in this manual.
5.
Ice water bath should be checked periodically as
instructed to make sure correct water is maintained
in water tank for maximum cooling.
6.
The drop--in refrigeration assembly condenser coil is
equipped with a washable air filter that must be
cleaned every 30-days as instructed .
7.
Carbonator water pump motor and carbonated wa-
ter circulating pump motor bearings must be oiled as
instructed in Service Manual (P/N 312021004).
8.
Carbonator water pump water inlet strainer screen
and double liquid check valve must be inspected
and cleaned at least once a year under normal cir-
cumstances and after any water system disruption
(plumbing work, earthquake, etc.).
9.
Clean and service Cooling Unit CO
valve. The CO
gas check valve must be inspected
2
and serviced at least once a year under normal
conditions and after any CO
disruption as instructed in Service Manual
(P/N 312021004)
Weekly
Service Person
9
cylinder is
2
gas inlet check
2
system servicing or
2
Monthly
Quarterly
D M Q A
O
S
S
S
O
O
S
S
S
Annually
312021002

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sentry iii-a

Table of Contents