Preparation For Installation - Samson 44-2 Mounting And Operating Instructions

Table of Contents

Advertisement

Special storage instructions for elastomers
Elastomer, e.g. operating diaphragm
− To keep elastomers in shape and to pre-
vent cracking, do not bend them or hang
them up.
− We recommend a storage temperature of
15 °C for elastomers.
− Store elastomers away from lubricants,
chemicals, solutions and fuels.
Tip
SAMSON's After-sales Service can provide
more detailed storage instructions on re-
quest.
EB 2623-1 EN
Measures for preparation

4.4 Preparation for installation

Proceed as follows:
Î Flush the pipelines.
Note
The plant operator is responsible for clean-
ing the pipelines in the plant.
Î Check the regulator to make sure it is
clean.
Î Check the regulator for damage.
Î Check to make sure that the type desig-
nation, valve size, material, pressure rat-
ing and temperature range of the regula-
tor match the plant conditions (size and
pressure rating of the pipeline, medium
temperature etc.).
Î Check any mounted pressure gauges to
make sure they function.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

44-344-9

Table of Contents