Download Print this page

Cornelius Universal 750 Pre-Mix Installation Instructions Manual page 7

Copper evaporator coil kit on universal 750 pre-mix dispenser

Advertisement

B.
Place ice bank control sensing bulb in product coils basket holder. BE CAREFUL NOT TO KINK CAP-
ILLARY TUBE. COIL EXCESS TUBE AND PLACE IN A SAFE AREA.
C.
Install new ANODE (item 2) in product coil basket holder.
D.
Connect anode wire to evaporator tank using aluminum SHEET METAL SCREW (item 3).
E.
Install dispensing valves, plate gasket, and plate on unit and secure with shank nuts.
F.
Connect product lines to back of dispensing valve sleeves.
G.
Make sure rubber washers are in place on tank coil line fittings.
H.
Remove water fill plug from water fill hole in agitator motor and cover assembly.
I.
Using hack saw (see Figure 1), cut out corner of cover assembly water fill hole enough to fit over lines
connected to new copper evaporator coil.
J.
Very carefully, place agitator motor and cover assembly in unit. Secure cover assembly in unit with
screws.
K.
Secure product coil line fittings to cover assembly with hex nuts.
L.
Connect agitator motor ground wire and power cord.
M. Connect product inlet line swivel nut connectors to product coil line fittings on cover assembly.
IMPORTANT: Install RUBATEX INSULATION (item 7) on copper tubing as follows:
A. Cut rubatex insulation to length for length of tubing to be insulated.
B. Remove paperback from cut piece of insulation.
C. Lay insulation length wise along copper tubing, then wrap insulation on tubing.
6. Using RUBATEX INSULATION (item 7), wrap accumulator from insulating tubing on bottom of accumulator
to solder connection on compressor. MAKE SURE REFRIGERATION PLUMBING AND ITS COM-
PONENTS DO NOT INTERFERE WITH CONDENSER FAN.
7. Using RUBATEX INSULATION (item 7), wrap suction line assembly tubes where they enter evaporator
tank.
8. Fill water tank with clean water to top of stainless steel coils located in coil basket. USE
LOW-MINERAL-CONTENT WATER WHERE A LOCAL WATER PROBLEM EXISTS.
9. Install unit top cover and secure with four screws.
10. Install lower access grilles on unit.
11. Install unit drip tray.
TESTING
Test run unit to ensure it builds an ice bank (43 lbs.) and shuts off.
7
189159001

Advertisement

loading

This manual is also suitable for:

185216000