The selection of the hole to be used is determined based on the
maximum output requested, as illustrated in Tab. J.
In the factory, the adjustment is adjusted for the maximum stroke
(hole 10, Fig. 15).
The gas pipes leave the factory calibrated at
notch 1.
The adjustment shown in Fig. 16 allows the gas
WARNING
pipes to be positioned in the best way for the ap-
plication on which the burner is installed (e.g. boil-
ers with flame inversion chamber).
20087244
Installation
Leverage hole
5
5
6
8
5
6
8
10
20077710
20
GB
Output (kW)
From
A
1100
4000
4000
6600
6600
8100
8100
10100
1500
5500
5500
7500
7500
9650
9650
11100
Tab. J
Fig. 16