Pump - Riello C9511200 Installation, Use And Maintenance Instructions

Light oil burners
Table of Contents

Advertisement

PUMP

A
GPH
B
PSI
C
"Hg
D
cSt
E
°F - °C
F
PSI
G
PSI
H
inch
(A)
AL 65 C
21.5
58 - 261
13
2 - 12
140 - 60
29
174
0.006
D2286
9
PUMP (A)
1 - Suction
2 - Return
3 - Pressure gauge attachment G 1/8
4 - Vacuum gauge attachment
5 - Pressure adjustment screw
A - Min. delivery rate at 174 PSI pressure
B - Delivery pressure range
C - Max. suction pressure
D - Viscosity range
E - Fuel oil max. temperature
F - Max. suction and return pressure
G - Pressure calibration in the factory
H - Filter mesh width
PUMP PRIMING
- Before starting the burner, make sure that the
tank return line is not clogged. Obstructions in
the line could cause the seal located on the
pump shaft to break. (The pump leaves the factory
with the by-pass closed).
- In order for self-priming to take place, one of the
screws 3)(A) of the pump must be loosened in order
to bleed off the air contained in the suction line.
- Start the burner by closing the control circuit and
with switch 1)(B)p.10 in the "ON" position. The pump
must rotate in the direction of the arrow marked on
the cover.
- The pump can be considered to be primed when the
fuel oil starts coming out of the screw 3). Stop the
burner: switch 1)(B)p.10 set to "OFF" and tighten the
screw 3).
The time required for this operation depends upon the
diameter and length of the suction tubing. If the pump
fails to prime at the first starting of the burner and the
burner locks out, wait approx. 15 seconds, reset the
burner, and then repeat the starting operation as often
as required. After 5 or 6 starting operations allow 2 or
3 minutes for the transformer to cool.
Do not illuminate the flame sensor or the burner will
lock out; the burner should lock out anyway about 10
seconds after it starts.
Important:
the priming operation is possible because the pump is
already full of fuel when it leaves the factory. If the
pump has been drained, fill it with fuel through the
opening on the vacuum gauge connection prior to
starting; otherwise, the pump will seize. Whenever the
length of the suction piping exceeds 66 - 99 ft, the
supply line must be filled using a separate pump.
1/4" NPT
1/4" NPT
G 1/8

Advertisement

Table of Contents
loading

Table of Contents