Stacking: Requires Kit - Scotsman CME1056 User Manual

Cme1056 series;
Hide thumbs Also See for CME1056:
Table of Contents

Advertisement

CME1056

Stacking: Requires Kit

Only like models may be stacked. Begin after the
bottom unit has been placed on the ice storage bin
and secured. Stacking requires heavy duty leg kits.
Casters are NOT recommended.
Bottom Machine:
1. Remove front, side, and top panels.
2. Hang the plastic shield from the tabs on the
stainless steel bracket.
3. Locate the two notches on the sides of the top
edge of the freezing compartment.
4. Place the bracket over the notches of the
freezing compartment.
Bracket
5. Secure bracket to freezing compartment with
screws from the kit (from the sides).
6. Locate gasket material in kit. Place a layer of
gasket material on the top edge of the plastic
freezing compartment.
7. Place the top ice machine onto the bottom one.
Secure together with hardware from the top
machine. Remove front and left side panels.
Upper Machine:
8. Knock out 1 hole in the lower left (viewed from
the front) corner of the upper unit's back panel.
Lower Unit:
9. Knock out 1 hole in the upper left (viewed from
the front) corner of the lower unit's back panel.
10. Position the strain reliefs over the wrapped
portion of the stacking kit wire harness.
11. Route the Stacking Kit wire harness from the
back to the top and bottom machines thru the
holes made in steps 8 and 9.
The harness is marked which end goes to which
Notch
machine.
Push the strain reliefs into place from the back of
the machines.
Follow local codes for 24 volt wire
12.Route wire harness in lower ice machine to the
controller. Connect to terminal #7. Plug the two
free wires onto thermostat terminals #1 and #2
Routing of
Harness
Shield
May 2000
Page 8

Advertisement

Table of Contents
loading

Table of Contents