Equipment Setup And Close Procedure; Equipment Setup Procedure; Equipment Close Procedure - Multiplex 2803 Installation, Use & Care Manual

Super-chill refrigeration units
Table of Contents

Advertisement

Section 3

Equipment Setup and Close Procedure

EQUIPMENT SETUP PROCEDURE

1. Ensure that all valve nozzles are attached to the
valves.
2. Observe pressure of CO
500 psi (34 bar) or more, or bulk CO
or more. Primary regulator set at 90 psi (6 bar) and
the secondary regulator set at 35 psi (2.4 bar).
3. Observe the control panel to verify that all pressure
gauges are set at correct operating pressures.
4. Check the syrup tanks to make sure a sufficient
number of tanks are connected in series to satisfy
business volume.
5. Clean syrup inlet and outlet quick disconnects at the
same time tanks are replaced. Rinse disconnects in
clean potable water.

EQUIPMENT CLOSE PROCEDURE

1. Clean the underside of the dispensing tower around
the nozzle area with a clean damp towel.
2. Pour at least 60 oz (1.8 liters) of warm water down
the drain openings.
Part Number 000003912 6/17
high pressure tank of
2
tank of 150 psi
2
Operation
3-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

11m44m50mPost-mix sodaSc180Sc340 ... Show all

Table of Contents