Routing Insulated Conduit; Connecting Insulated Conduit At The Unit; Connecting Insulated Supply Lines - Multiplex 2803 Installation, Use & Care Manual

Super-chill refrigeration units
Table of Contents

Advertisement

Section 2

ROUTING INSULATED CONDUIT

1. Before connecting conduit, evaluate store situation
and lay out how the conduit will be routed. Be sure
to route conduit away from traffic areas, moving
parts, and heat sources.
2. Physically route conduit per evaluated plan.
Examine conduit routing and check for neatness,
kinks, and interferences.

CONNECTING INSULATED CONDUIT AT THE UNIT

NOTE: List what color line was connected to which
product so it can be connected correctly at the towers.
1. Route the conduit to the front opening and into the
unit. Cut the insulation back from the lines inside the
water bath.
2. Connect the circulating water by connecting one line
to the circulating pump outlet line (3/8" barb) and
clamp in place. Connect the other line to the
bulkhead return fitting located by the agitator motor
(3/8" barb) and clamp in place.

CONNECTING INSULATED SUPPLY LINES

Connecting the insulated beverage conduit at the
refrigeration unit
1. Route the Multipar beverage conduit from the
refrigeration unit to the dispensing station(s)
according to the instructions enclosed with the
conduit kit. Always route the conduit in a neat and
orderly manner.
2. Insert the Multipar conduit into the outlet opening on
the left hand side of unit. Conduit insulation must
extend inside of opening in unit for proper operation
of equipment.
Part Number 000003912 6/17
Insulated
Beverage
Conduit
NOTE: Multipar conduit is color coded for easy
identification of lines. When making connections always
attach lines requiring the longest connection from the
insulation first. The remaining lines can be trimmed as
required to make the routing neat and secure.
3. Locate the two blue carbonated water lines of the
Multipar conduit. Attach one of the blue lines to the
tee fitting located on top of the carbonator tank.
Attach the other blue line to John Guest elbow fitting
on the stainless coil labeled "8".
4. Locate the black plain water line of the Multipar
conduit. Attach this line to the elbow fitting on the
stainless coil labeled "W".
5. The remaining lines of the Multipar conduit are syrup
supply lines and must be attached to the appropriate
elbow fittings on stainless steel syrup coils. Note the
numbered lines attached to the opposite end of each
syrup coil when making connections.
Installation
2-25

Advertisement

Table of Contents
loading

This manual is also suitable for:

11m44m50mPost-mix sodaSc180Sc340 ... Show all

Table of Contents