Installation Checklist - Multiplex 2803 Installation, Use & Care Manual

Super-chill refrigeration units
Table of Contents

Advertisement

Section 2
NOTE: A manual fill valve is incorporated into the water
circuit to the carbonator tank. This valve can be used to
manually add water lost for any reason. Do not leave this
valve ON constantly, only use it for filling and topping off.
The water bath must be drained, flushed, and refilled
every six months.
2. Turn ON the switch labeled "Refrigeration". Allow
unit to run for about 15 minutes before proceeding to
step 3.
3. Turn ON the switch labeled "Agitator".
Note: Turn this switch OFF to perform any operations in
the water bath area.
With water bath water temperature of 65°F (18°C), ice
must begin to form on the evaporator coils in
approximately 2 hours. The unit will build a full ice bank
in approximately 4 to 6 hours (depending on ambient
water temperature).
Water Bath
Tank
Tab
Clamp
4. Before turning on the carbonator or circulator switch,
verify that the pump box assembly has been
mounted and connected to the unit and the
appropriate syrup and water has been supplied.
5. Turn on the main water supply to the booster
assembly. Verify the booster is plugged in and that
the accumulator tank valve is open. (If the system
has an optional "Out-of-Syrup" device, verify that it is
unplugged.)
6. Verify the pump is running. Place the valve on the
right side of the pump box in the purge position until
all air bubbles have passed through the line. Turn
the valve back to "dispense". Plug the Out-of-Syrup
device power cord into an appropriate wall outlet at
this time (if supplied).
NOTE: Verify that the pump box holding tank is full
before proceeding.
7. Turn on the circulator and carbonator switches. The
carbonator must run for approximately 1 to 3
minutes and shut off. The circulator must run
continuously. Verify that water is returning to the
water bath through the return bulk head fitting.
Part Number 000003912 6/17
Overflow
Tube
Drain Tube
Important
Wait until a thin layer of ice has begun to form on the
evaporator before proceeding any further.
8. Go to the tower(s) and brix the valves. Using a syrup
separator and volume cup, adjust the flow rate of the
carbonated water to two fluid ounces per second.
Then, using the separator and a brix cup, adjust the
syrup flow rate for a ratio of carbonated water to
syrup to 5 to 1.

Installation Checklist

Check all fittings and conduit attachments for
leaks. Check all insulated connections to make
sure that they are sealed.
Observe the pump operations for leaks.
Check the water bath for full ice bank.
The stabilized water bath operating temperature
must be maintained at 33°F (.6°C) to 35°F
(1.7°C).
Close water bath feeder valve completely.
Installation
2-31

Advertisement

Table of Contents
loading

This manual is also suitable for:

11m44m50mPost-mix sodaSc180Sc340 ... Show all

Table of Contents