WATER BATH ACCESS SS

• Has a round hole in the front and back panels with
no edge trim to protect lines.
• End panel has two ovals in the rear of the panel with
edge trim to help protect conduit lines.

WATER BATH ACCESS TS

• All panels have large oval access holes with interchangeable
covers.
• Front panel has 3 hole cover for water and CO
• Back panel has solid cover.
• End panel has one open cover and one solid cover.
• Open cover provides wide ledge for conduit line protection.

SERVICE ACCESS SS

• Front panel was solid and did not allow easy access for service.
• Switch panel was mounted flush to end panel.
3-4

SERVICE ACCESS TS

• Front panel is split to allow front access to the compressor
compartment.
• Switches are recessed and the edge has trim panel to protect
fingers from sheet metal edges.

Start-up (Non-ERC)

PLACING EQUIPMENT IN OPERATION
Before placing equipment in operation, verify that all
requirements for roof mounted Remote Condenser Units
(if applicable) have been satisfied. Refer to the
instructions on installing the Remote Condenser.
1. Fill the refrigeration unit water bath tank with water
to within 1/2" (1.27 cm) of the top of the overflow
tube.
2. Open the manual water shut-off valve to the water
cooled condenser (if applicable).
3. Turn ON the rocker switch labeled "Refrigeration" to
begin building an ice bank.
line routing.
2
4. Turn ON the rocker switch labeled "Agitator".
NOTE: On TS units 3 & 4 are combined into 1 switch.
5. Ice will begin to form on the evaporator coils in
approximately 2 hours.
6. The refrigeration unit will build an ice bank in
approximately 4 to 6 hours.
7. If optional CO
installed on the refrigeration unit, refer to the
installation instructions for operation and testing the
circuits for leaks.
8. The carbonation circuits "A" and "B," as well as the
syrup circuits must be checked for leaks and
possible cross circuits before turning ON the water
supply to carbonator pumps.
9. Turn on main water supply. Set incoming regulator
to 55 psi on the CO
root beer system's internal regulator (must be lower
than CO
/Water Control Panel has been
2
panel; 25 psi for the Model 11M
2
supply pressure). Once water is supplied
2
Part Number 000003912 6/17