Summary of Contents for Rutland County Garden Furniture Felt Shingle Car Port
Page 1
Assembly Instructions Felt Shingle Car Port 2 Post (2.9, 3.6 & 4.3M) Before you commence the assembly process, we recommend that you read these instructions thoroughly beforehand to familiarise yourself with the assembly process and to also check that you have the correct components.
Page 2
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Product Specification Table Please use the table below in conjunction with the Components list on page 3 to check you have the correct parts before commencing assembly of your carport.
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Components list The Product Specification table on page 2 will contain quantities for the components shown below. 40mm woodscrews 60mm woodscrews 50mm coachscrews 100mm coachscrews 120 mm coachscrews Wall plate...
Page 4
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Roof depth reference table Applicable in Steps 1 & 4 of the instructions Panel length 2.5M 3.5M 4.5M Wall plate height - top edge* 2550 2637 2724 2811 2898...
Page 5
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Step 1 Step 2 Begin by taking the wall plate and placing it horizontally Place one of the posts on a flat surface as shown and then (use a spirit level or laser) on the wall where you would like insert one of the runners into the post slot, using the the car port located.
Page 6
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Now drop one of the rafters into place… …butting it up against the outer face of the post before securing in place with a 120mm coachscrew driven down into the runner.
Page 7
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Step 9 Step 10 Now add the intermediate rafters in the same way using the Place the end brace against the inner face of the outer markings on the runner and wall plate to correctly align each...
Page 8
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Step 13 Step 14 Take the tongue and groove ridge (with no tongue), groove Slide a tongue and groove panel up the rafters and fully side facing down the roof and position it at the top of the locate the tongue into the ridge piece...
Page 9
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Step 17 Step 18 Add the final tongue and groove panel before fixing into Slot the fascia panel into place so that it is butted up place with a 60mm into each rafter spaced 20mm from the against the underside of the roof and against the rafter top edge of the panel.
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Shingle installation Tools required Measuring tape Hammer Clout nails Sharp knife Straight edge Recommended Guidelines: • Wear personal safety equipment during installation – Goggles, Safety Boots, Gloves • Consider an underlay for larger projects, as this will prolong the life of your Shingles •...
Page 11
Felt Shingle Car Port - 2 Post (2.9, 3.6 & 4.3M) Creating the eaves 1. To create the Eaves (lower roof edge) on your project, take a strip of Shingles and cut off the tabs. It is recommended to cut from the back for easy removal of the tab. Leave the self-adhesive strip covered until you are ready to apply the shingle.
Need help?
Do you have a question about the Felt Shingle Car Port and is the answer not in the manual?
Questions and answers