Blow-Down - Veit SG67 Operating Instructions Manual

Table of Contents

Advertisement

Maintenance and cleaning

Blow-down

8.2 Blow-down
42
Fig. 14: Position of the blow-down tank during blow-down
1
Screw cap
2
Marking
3
Diffuser
CAUTION!
Risk of burns!
Incorrect blow-down poses a risk of burns. The
following safety measures must be performed in
a controlled manner prior to every blow-down
process:
Only use original VEIT blow-down tank.
Check blow-down tank and blow-down hose for
visible damage.
In the event of damages, replace the tank
and/or hose.
Do NOT start the blow-down process.
The blow-down tank must be filled with cold
water up to the mark.
The cover of the blow-down tank must be fixed
between the two stainless steel clamps.
The holes in the diffuser must be free from any
lime deposits and contamination.
The diffuser must be inserted in the tank as
close as possible to the bottom.
The screw cap must be tightly screwed onto
the tank.
Steam generator VEIT SG67
» Continued on the next page
30.09.2022

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents