Installation And Commissioning; Pipe Installation; Shutting Off The Heating Circuit - Watts HKV2013AF Series Installation And Operating Manual

1" stainless steel heating circuit manifold with flow meters
Hide thumbs Also See for HKV2013AF Series:
Table of Contents

Advertisement

EN

8 Installation and commissioning

!
WARNING
Hot water!
Severe scalding possible.
• Allow the product to cool before carrying out any maintenance,
cleaning or work repair.
• Do not put hands into hot water when draining the product.

8.1 Pipe installation

1. Cut the plastic, copper or multilayer pipe to length perpendic-
ular and deburr / calibrate. Push the clamping ring nut over
the pipe.

8.2 Shutting off the heating circuit

1. The valves on the return can be closed, e.g. for flushing and
filling the heating circuit. To do this, put the protective cap on
the valve and close it by turning it clockwise.
HKV2013AF-IM-DE-W-UK-03-2023-Rev.2 | Part no. 10086671
2. Push the grab ring onto the pipe and insert the hose nozzle.
3. Push the conical end of the pipe all the way into the connec-
tion on the manifold.
4. Tighten the clamping ring nut by hand. Push the plastic, cop-
per or multilayer pipe up to the stop.
5. Hold the outlet screw connection using a 24 mm open-end
wrench or spanner and tighten the clamping ring nut using a
30 mm open-end spanner (approx. 25-30 Nm). Fit the pipe
without any tensile, compressive or torsional forces.
Do not exceed the max. torque stated in the installation in-
structions for the compression joint used.
2. The flow meter can be closed with a air vent key. However,
this is not necessary for filling and flushing the circuits.
If the flow meter is shut off, the following opening sequence
must be observed in order to avoid malfunction or damage.
First, open the flow meter, then the control valve.
9

Advertisement

Table of Contents
loading

Table of Contents