Deck Discharge Deflector Shield Installation (Side Discharge Models Only); Pto Shaft Guard Installation; Tilt-Up Roller Wheel Installation - Walker B23 Operator's Manual

Table of Contents

Advertisement

Assembly Instructions
Deck Discharge Deflector Shield Installation
(Side Discharge Models Only)
Attach the side discharge deflector shield using
two (2) 3/8-16 x 1-1/4 in. bolts, 3/8-16 ESNA nuts,
and 3/8 in. wave spring washers. The wave wash-
ers fit between the two hinging surfaces. Tighten
the nuts until the shield moves freely but is not
loose.
DO NOT operate the machine without the
grass deflector shield attached and in the
lowest possible position.
Deck Discharge Shield Installation
20
WARNING
Attach Shield

PTO Shaft Guard Installation

Position the shaft guard as shown and mount with
two (2) 1/4-20 x 1/2 in. bolts.
Carrier Frame
Tube Sockets
PTO Shaft Guard Installation

Tilt-Up Roller Wheel Installation

Mount the two (2) tilt-up roller wheels on the brack-
ets on the rear skirt of the deck housing using the
P/N 8490 axle bolt, 3/8 in. plain washer, 3/8 in.
wave spring washer (between bracket and wheel)
and 3/8-16 Whiz locknut. Tighten the axle bolt until
the wheel rolls freely, but is not loose.
Roller Wheel Installation
B23
Attach
Guard
Roller
Wheels

Advertisement

Table of Contents
loading

Table of Contents