Rheem RGRK-12ERAJS Series Installation Instructions Manual page 31

Upflow and downflow/horizontal high efficiency condensing two-stage gas furnaces
Table of Contents

Advertisement

(-)XGY-G02 Side Wall Vent
This termination for horizontal venting
only.
IMPORTANT: Do not install on the
prevailing winter wind side of the
structure. Observe same clearance
specified for horizontal, standard
termination.
NOTE: Multi-venting-No common
venting.
FIGURE 25
VENT KIT INSTALLATION OPTIONS
FIGURE 26
TYPICAL INSTALLATIONS
NOTE: Install the vent and air intake
piping into the vent plate openings.
Seal all gaps between the pipes and
wall. Be Sure To Use Silicone
Sealant to seal the vent pipe to the
vent cap to permit field disassembly
for annual inspection and cleaning.
Also seal all pipe penetrations in wall.
To prevent possibility of condensate
freeze-up or recirculation, do not
install vent kits one above the
other.
EXHAUST
AIR
INTAKE
NOTE: The vent illustration in Figure
26 can be used for non-direct vent
terminations also.
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rgrl-12erajs seriesRgtk-12erajs series

Table of Contents