Rheem RGRK-12ERAJS Series Installation Instructions Manual page 23

Upflow and downflow/horizontal high efficiency condensing two-stage gas furnaces
Table of Contents

Advertisement

DIRECT VENT
INSTALLATIONS
WARNING
READ AND FOLLOW ALL
INSTRUCTIONS IN THIS SECTION.
FAILURE TO PROPERLY VENT
THIS FURNACE CAN CAUSE
CARBON MONOXIDE POISONING
OR AN EXPLOSION OR FIRE,
RESULTING IN PROPERTY
DAMAGE, PERSONAL INJURY
OR DEATH.
Direct vent installations require a
dedicated combustion air and venting
system. All air for combustion is taken
from the outside atmosphere and all
combustion products are discharged to
the outdoors. Therefore, no
ventilation or combustion air
openings are required.
IMPORTANT: The plastic combustion
air and venting components are of
Schedule 40 PVC. If using ABS piping
ensure that the solvent cement is
compatible for joining PVC to ABS
components or use a mechanical
connection that can withstand the vent
temperatures and are corrosion
resistant.
INSTALLATION GUIDELINES
All exhaust piping must be installed in
compliance with Part 7, "Venting of
Equipment," of the latest edition of the
National Fuel Gas Code NPFA54/
ANSI Z223.1-, local codes or
ordinances and these instructions.
1. Vertical piping is preferred.
2. All horizontal piping must slope
upward a minimum of
/
1
4
per foot of run so that condensate
drains toward the furnace.
3. All horizontal runs must be
supported at least every 4 feet.
No sags or dips are permitted.
4. IMPORTANT: Do not common
vent with any other appliance. Do
not install in the same chase or
chimney with a metal or high
temperature plastic pipe from
another gas or fuel-burning
appliance unless the required
minimum clearances to
combustibles are maintained
between the PVC pipe and other
pipes. Minimum 3 ft. clearance
required between combustion air
inlet and any other exhaust.
5. For horizontal runs where water
may collect, wrap the vent pipe
with self-regulating 3 or 5 watt
heat tape. The heat tape must be
U.L. listed and installed per the
manufacturer's instructions.
6. The minimum, pipe length is
5 feet for combustion air and
exhaust.
7. Do not install elbows back to
back. Allow at least 15" between
elbows.
Size the exhaust and combustion air
intake pipes as specified in Table 4 or
Table 5. This table lists the maximum
TABLE 4
UPFLOW UNITS FOR DIRECT VENT APPLICATIONS - AIR FOR COMBUSTION
PROVIDED FROM OUTDOORS
MAXIMUM ALLOWABLE LENGTH IN FEET OF EACH EXHAUST PIPE AND INTAKE AIR PIPE
FURNACE
PIPE
INPUT
SIZE
45,000
2"
2"
60,000
3"
75,000
3"
90,000
3"
105,000
3"
120,000
3"
NOTES:
1. N.A. - NOT APPLICABLE
2. MAXIMUM OF 6 ELBOWS MAY BE USED. DO NOT COUNT ELBOWS IN ALTERNATE TERMINATION KIT.
MEDIUM OR LONG SWEEP ELBOWS MAY BE USED.
3. A 45 DEGREE ELBOW IS CONSIDERED ONE ELBOW.
4. CONCENTRIC TERMINATION NO. RXGY-E03/RXGY-E03A IS FOR THRU-THE-ROOF OR THRU-THE-WALL VENTING.
5. USE KITS RXGY-DO2/D02A (2"), RXGY-G02 (2"), OR RXGY-D03/D03A (3") FOR STANDARD OR ALTERNATE
THRU-THE-WALL VENTING.
6. USE KITS RXGY-D04/D04A FOR ALTERNATE VENTING OF 120,000 BTUH UNITS WITH LONG RUNS.
7. KIT NUMBERS CONTAINING SUFFIX "A" ARE APPROVED FOR INSTALLATION IN CANADA.
8. NO SCREENS MAY BE USED TO COVER COMBUSTION AIR AND EXHAUST.
1
(A*) = 17
" CABINET (B*) = 21" CABINET
2
TABLE 5
DOWNFLOW/HORIZONTAL UNITS FOR DIRECT VENT APPLICATIONS - AIR FOR COMBUSTION
PROVIDED FROM OUTDOORS
MAXIMUM ALLOWABLE LENGTH IN FEET OF EACH EXHAUST PIPE AND INTAKE AIR PIPE
inch
FURNACE
PIPE
INPUT
SIZE
2"
60,000
3"
75,000
3"
90,000
3"
105,000
3"
120,000
3"
NOTES:
1. N.A. - NOT APPLICABLE
2. MAXIMUM OF 6 ELBOWS MAY BE USED. DO NOT COUNT ELBOWS IN ALTERNATE TERMINATION KIT.
MEDIUM OR LONG SWEEP ELBOWS MAY BE USED.
3. A 45 DEGREE ELBOW IS CONSIDERED ONE ELBOW.
4. CONCENTRIC TERMINATION NO. RXGY-E03/RXGY-E03A IS FOR THRU-THE-ROOF OR THRU-THE-WALL VENTING.
5. USE KITS RXGY-DO2/D02A (2"), RXGY-G02 (2"), OR RXGY-D03/D03A (3") FOR STANDARD OR ALTERNATE
THRU-THE-WALL VENTING.
6. USE KITS RXGY-D04/D04A FOR ALTERNATE VENTING OF 120,000 BTUH UNITS WITH LONG RUNS.
7. KIT NUMBERS CONTAINING SUFFIX "A" ARE APPROVED FOR INSTALLATION IN CANADA.
8. NO SCREENS MAY BE USED TO COVER COMBUSTION AIR AND EXHAUST.
1
(A*) = 17
" CABINET (B*) = 21" CABINET
2
VENT TERMINATION
TERMINATION
KIT RECOMMENDED
Standard/Concentric
RXGY-D02/RXGY-D02A/RXGY-E03A/GXGY-G02
Alternate
RXGY-D02/RXGY-D02A
Standard/Concentric
RXGY-D02/RXGY-D02A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D02/RXGY-D02A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D04/RXGY-D04A
VENT TERMINATION
TERMINATION
KIT RECOMMENDED
Standard/Concentric
RXGY-D02/RXGY-D02A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D02/RXGY-D02A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-D03A/RXGY-G02
Alternate
RXGY-D03/RXGH-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGH-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Standard/Concentric
RXGY-D03/RXGY-D03A/RXGY-E03A/RXGY-G02
Alternate
RXGY-D03/RXGY-D03A
Alternate
RXGY-D04/RXGY-D04A
NUMBER OF ELBOWS
45 or 90 Degrees
Medium / Long Radius ONLY
2
4
6
65
60
55
55
50
45
40
35
30
40
35
30
120
120
120
110
105
100
50
40
NA
50
40
NA
110
105
95
50
40
35
50
40
NA
50
40
NA
50
40
30
45
35
30
NUMBER OF ELBOWS
22.5, 45 or 90 Degrees
Medium / Long Radius ONLY
1 - 2
3 - 4
5 - 6
40
35
30
30
25
20
120
120
120
110
105
100
120
120
120
100
95
85
110
105
95
50
40
35
65
60
55
50
40
35
40
35
30
40
35
30
45
35
30
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rgrl-12erajs seriesRgtk-12erajs series

Table of Contents