NETGEAR M4350 Series Hardware Installation Manual page 50

Fully managed switches
Hide thumbs Also See for M4350 Series:
Table of Contents

Advertisement

2
3
Figure 15. Package contents for an M4350 series full-width model
To check the package contents:
1. Place the container on a clean flat surface, and cut all straps securing the container.
2. Unpack the hardware from the boxes by carefully removing the hardware and placing
it on a secure and clean surface.
3. Remove all packing material.
4. Verify that the package contains the following items:
Number
Item
1
Switch of the model that you ordered
Note: Rubber protection caps are installed in the SFP sockets. If you install an SFP transceiver
module, you must remove the cap from the SFP socket.
2
Type-C USB console cable
3
AC power cable or cables (varies by region)
Installation
Fully Managed Switches M4350 Series
1
4
50
5
8
7
Hardware Installation Guide
6

Advertisement

Table of Contents
loading

Table of Contents