Worcester benchmark ZWB 7-25 R 25 HE Design, Installation And Servicing Instructions page 20

Table of Contents

Advertisement

Installation
120
Fig. 21 Flue length - rear
Fig. 22 Flue length - side
Measure 'L' from the end of the metal section of the flue
terminal to the centre of the flue outlet on the boiler as
shown in Fig. 21 & Fig. 22 and deduct 90mm from that
measurement.
Cut both inner and outer flue pipe square at the oppo-
site end to the terminal without creasing the tubes.
Remove any burrs before fitting the terminal to the tur-
ret.
20
L
6 720 610 599 - 01.TD
L
6 720 610 599 - 01.TD
Fig. 23 Flue terminal position
Assemble flue system completely. Push the ducts fully
together and clamp in the positions. The slope of the
terminal outlet must face downwards.
The assembly will be made easier if a solvent free
grease is lightly applied i.e Silicone lubricant, to the
male end of the ducts.
NOTE: An inner wall sealing plate is provided
which should be fitted to the ducts before assem-
bly.
Push the assembly through the wall and fix the turret to
the appliance with the screws provided. Refer to fig.
24.
Flue Turret
Flue seal
Retaining
Screw
Appliance
Flue Socket
Fig. 24 Flue turret
Ensure that the turret is fully secured to the socket on
the boiler.
If the terminal is within 2 m of the ground where there is
access then an approved terminal guard must be fitted.
The guard must give a clearance of at least 50 mm
around the terminal and fixed with corrosion resistant
screws.
Outer Wall Face
Flue Terminal
Wall Sealing Gasket
6 720 610 599-00.TD
Flue Turret to
Boiler Sealing
Gasket
6 720 610 599 - 01.TD
6 720 611 441 GB (03.11)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark zwb 7-30 r 30 he47 311 7747 311 78

Table of Contents