Kongsberg SIMRAD TP90 Installation Manual page 25

Catch monitoring positioning transceiver unit
Table of Contents

Advertisement

d
Make sure that adequate ventilation is available to avoid overheating.
e
Make sure that the installation method allows for the physical vibration,
movements and forces normally experienced on a vessel.
Note
To allow future maintenance, you must mount the unit with its cables and connectors
available for easy access.
4
Make sure that the chosen location meets the installation requirements.
5
Bulkhead installation
a
Mount the wall bracket using suitable bolts or screws.
b
Place the power supply in the bracket so that the small lamp is visible.
6
Desktop installation
a
Place the unit in a suitable location.
b
Position and fasten the unit using the bracket and the mounting screws.
7
"Ad hoc" installation
a
Place the unit in a suitable location (horizontally or vertically).
b
Position and fasten the unit using any means available.
8
Connect the cables.
a
Connect the AC power cable to the power supply.
The power supply unit has a C14 plug.
b
Connect the DC plug to the power input on the transceiver.
The DC cable is fixed to the power supply.
484238/A
Cable layout and interconnections
23

Advertisement

Table of Contents
loading

Table of Contents