Electrical Connection - Dimplex Optimyst Cassette 500 Project Operating Instructions Manual

Table of Contents

Advertisement

Water Connection – Additional Information
Water Pressure: the water pressure on the appliance should be between 8Bar (800Kilopascals) and 0.5Bar
(50Kilopascals). Where required, use a pressure reducing valve.
If the product is being supplied from a header tank, a head of at least 2 metres must be maintained above the

ELECTRICAL CONNECTION

Plug the fire into a 16amp 230/240 Volt outlet. Be sure to have access to the plug after installation to allow for
disconnection. Ensure that the supply cable exits at the back of the fire at the right or left hand corner to suit your supply
socket location and is not trapped under the fire such that it might cause it to be damaged.
INSTALLING THE PRODUCT INTO SURROUND/ENCLOSURE
Once your enclosure has been built to the required dimensions and the electrical connection has been installed, follow
the steps below to install your product.
1.
Sit the product on the constructed base, ensuring the cable is accessible and not caught under the product.
2.
Ensure the product is at the correct height to suit the installation and ensure it is adequately level. This can be done
by adjusting the adjustable feet with a flat head screwdriver. (Fig 5) The levelness of the product can be verified by
checking the on-board spirit level which is located on the metal base towards the back of the fire (Fig 6).
3.
Once the product is at the correct height and is level, centre the product within the opening. If using the LED log fuel
bed (which is wider than the product), this can be done by fitting the fuel bed to the product. The fuel bed will centre
itself within the opening and its guides will centre the product underneath (Fig 7).
4.
With the product in its final position, remove the fuel bed and using suitable screws (not provided) screw the product
to the surround using the four fixing holes shown in Fig 8.
COMMISSIONING/INITIAL PRODUCT START-UP
CONNECTING THE RECEIVER/TETHERED REMOTE
With the fuel bed removed, Connect the Bluetooth receiver connector into the into the receiver cable socket at the back
of the appliance (Fig 9). It is important to ensure that the jack is pushed fully into the socket. Failure to fully insert the
connector will prevent the product from functioning correctly. The receiver has a cable length of 1.4m which will allow
you position it anywhere around the product. If you prefer to hide it, the receiver can be placed inside the surround/wall.
Please ensure that the receiver is not enclosed in metal, concrete or any other dense material, this will affect the signal
from the remote control.
INITIAL PRODUCT START-UP
In some cases, where low water pressure exists or where the product is being fed by the pump accessory, the product
may start to fill with water but not complete its first fill within the allowed filling time period. It is recommended that each
sump is primed with 600-700ml of water before switching on the product for the first time. If measuring this amount of
water is not possible, the water guide in the sump moulding can be used for reference. Fill the sump with water until the
top surface of the water is level with the top of the water guide. See Fig. 12B for details on the location of the water guide.
After priming the sump(s) the product can be switched on and it should begin to top off the sump(s) with water. Please
note, if no water is entering the sump, there may be an issue with the water supply to the product. This error will be
represented by the product flashing two times 30 seconds after first turning on the product. Check all water connections
and ensure that there are no leaks present. Also check that the leak prevention valve has not been activated; see
'Changing the Leak Prevention Valve Pad' paragraph below under 'Maintenance'. Reset the product by switching off the
main switch and leaving it rest for 20 seconds. Switch the main switch back on again and the product should resume
operation.
INSTALLING THE LOG FUEL BED (IF SUPPLIED)
The product is supplied with a 'metal fuel bed' fitted. If you have chosen to operate your product with a log fuel bed,
remove this metal fuel bed and retain it for future use (Fig. 12). Follow the steps below to install the log fuel bed.
1.
Gently lift the LED Log fuel bed out of its packaging. CAUTION: The fuel bed weighs 5kg. Be sure to only lift the fuel
bed by the two centre logs (Fig. 13).
2.
Place the fuel bed on top of the appliance, there are 4 plastic guides under the fuel bed to help locate it (Fig.7).
Please note the fuel bed can be placed front to back or back to front on the product.
3.
Once the fuel bed is in place, remove the small loose log (Fig 14). This small log is secured with magnets and should
easily lift off the fuel bed.
4.
Locate the DC jack under the small log and connect it to the corresponding DC jack located on the product through
the hole in the fuel bed (Fig.15).
5.
Each log fuel bed is supplied with a loose non LED log. For single CAS500P-RGB installations, this can be placed
on top of the fuel bed or stored away with the packaging. For CAS1000P-RGB or multiple product installations, the
loose log can be placed on the join in the centre between two fuel beds (Fig 16).
6
product.

Advertisement

Table of Contents
loading

Table of Contents