Download Print this page

Lister SB 113 H Instruction Manual page 13

Retrofit kit heating cable

Advertisement

Available languages

Available languages

5. Now position the heating cable cover over
the installed heating cable on the bowl.
7. Observe the sequence of the screw
connections!
Insert the washer and screw in the upper right
fastening hole and screw it together (fasten it).
See arrow!
9. Install the remaining washers and screws.
See arrows!
Installation of heating cable and of heating
cable cover has now been finished.
4. Place the heating cable further into the right
guide groove and press it into the cable holder.
Do not work with pointed tools!
ATTENTION:
It is essential that the returning heating cable
has to be placed on the right side of the screw
connection mandrel.
See arrow!
6. Attention!
It must be ensured that the 4 fastening holes of
the bowl and of the heating cable cover match
with each other.
8. Insert the washer and screw in the middle
fastening hole and screw it together (fasten it).
See arrow!

Advertisement

loading

This manual is also suitable for:

Sb 112 h zpsSb 112 hSb 113 h zps