Page 2
The accuracy of the analytics algorithm may be affected by different environmental factors or inappropriate installation. Please follow the procedures in this installation guide. ACTi will not be held liable for inaccuracies resulting from the aforesaid causes. Step 1: Prepare for Installation A.
Page 3
12V Power OUT Black 12V Power OUT GND Blue Wiegand IN Data 0 Gray Wiegand IN Data 1 P3 (Communication) Green Wiegand OUT Data 0 White Wiegand OUT Data 1 Orange RS232 Tx Yellow RS232 Rx (Network) Standard Gigabit Ethernet www.acti.com...
Page 4
Step 3: Connect Other Devices 1. Route the cables through the hole on the wall. 2. Connect the devices, such as the power adapter, to the cables with terminal block (refer to the earlier sections to check the proper wiring connections). www.acti.com...
Page 5
1.35 m 1.75 m 1.15 m 1.40 m 1.80 m 1.20 m 1.45 m 1.85 m 1.25 m 1.50 m 1.90 m 1.30 m 1.55 m 1.95 m Installation height (H) measured from the bottom of the device to ground www.acti.com...
Page 6
Apply screws to tighten above). the mounting bracket on the wall. Ensure the device is vertically installed and parallel to a vertical wall. Ensure power, network, communication, and I/O cables are available from the opening of the mounting bracket. www.acti.com...
Page 7
Slide the unit down to reach the bottom of the bracket. Power up the device to test if all the cables are connected correctly Finally, mount the two (2) bundled screws at the bottom of the device. www.acti.com...
Need help?
Do you have a question about the R21CF-32 and is the answer not in the manual?
Questions and answers