POWER SUPPLY
The electrical supply voltage and frequency must comply with the values stated on the
Maker's Plates on both the indoors and outdoors units.
ELECTRICAL TUBING
The units are designed connected as a fixture to fixed electric tubing. Do not use removable
plugs or flex for the power cable or the connection cables between the indoors and outdoors
units.
CONDENSATES DRAINAGE
Check that water drains properly by pouring a quantity into the indoors unit condensate tray.
Check that all connections are watertight and, as required, protect the pipe work with
insulation material if there is a risk of freezing or of condensation.
REFRIGERANT CONNECTIONS
Using an appropriate detection device, check the tightness of all refrigerant connections,
notably around the connecting valves of the outdoors unit. Check that all pipe work is
properly insulated.
CONNECTIONS THROUGH A WALL
Check the seal of the passage hole through a wall where connections pass outside the
building. Check that there is no direct contact between the connection tube and the wall
surface.
ATTACHMENT
Check that the outdoors and indoors units are attached securely. Refit any previously
removed items
FINAL T
FINAL T
FINAL TASKS
FINAL T
FINAL T
ASKS
ASKS
ASKS
ASKS
Replace the caps on the valves and check that they are properly tightened.
Attach the cables and connections to the wall with clamps as required.
Run the air conditioning system in the client's presence and explain all its functions.
Demonstrate the method of removing, cleaning and refitting the filters.
ARTING
AR
AR
AR
TING
TING
TING
TING
TRIO
High T
High T
High T ech
High T
High T
25
25
25
25
25
ech
ech
ech
ech
Need help?
Do you have a question about the TRIO HIGH TECH XLM12 and is the answer not in the manual?