Summary of Contents for SystemAir SAVE-P VTR 250/B
Page 1
SAVE–P VTR 250/B Installation instructions Document in original language | 271403 · v01...
Page 2
This also applies to products already ordered, as long as it does not affect the previously agreed specifications. Systemair is not liable or bound by warranty if these instructions are not adhered to during installation or service. 271403 | v01...
Contents Overview ............1 General Description ........1 Warranty ..........1 Type label..........1 Important Safety Information ......1 Intended Use.........1 Admonitions .........2 Technical Data ..........2 Dimensions and Weight ......3 Connections Left and Right models.....5 Installation recommendation regarding condensation ........5 3.3.1 Condensation inside of the unit .........5 3.3.2 Condensation outside of the...
For the assertion of warranty claims, the products must be correctly connected and operated, and used in accordance with the data sheets. Further prerequisites are a completed maintenance plan with no gaps and a commissioning re- port. Systemair will require these in the case of a warranty claim. Type label Before calling your service representative, make a note of the specification and production number from the type label, which can be found next to the external connections and inside of the unit.
| Technical Data • Keep all the warning signs on the device and in a legible condition. • The device is not to be used by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction. •...
Technical Data | Connections Left and Right models Position Description Right hand model (Supply air connection is situated on the right hand side of the unit viewed from the front) Left hand model (Supply air connection panel is situated on the left hand side of the unit viewed from the front) Symbol Description...
• Check completeness of the delivery. Verify that all ordered equipment is delivered before starting the installation. Any discrepancies from the ordered equipment must be reported to the supplier of Systemair products. Warning When opening the transport packaging, there is a risk of damage from sharp edges, nails, staples, splinters etc.
Installation | Location and Space Requirements The SAVE–P VTR 250/B should preferably be installed in a separate room (e.g. storeroom, laundry room or similar.). When choosing the location it should be kept in mind that the unit requires maintenance regularly and that the inspec- tion door should be easily accessible.
Page 12
| Installation C — concrete/bricks, W — wood block, G — gypsum, M — mineral wool X* — adaptable height according to needs. Make sure the mounting bracket is completely level. 271403 | v01...
Electrical connections | Follow the ventilation drawing when connecting the unit to the duct system. Ventilation Duct Connection and Insulation Important • Always cover the ventilation ducts during construction period. • Make sure there are no loose objects or impurities inside the ducts. Install the ducts, supply air diffusers and air intake grilles as shown in the ventilation drawing.
| Before Starting the System Fig. 4 Main circuit board connections Position Description Connection to the external connection box Terminals for a heater Terminals for a TRIAC Terminals for the mains power supply Terminals for power supply of extract air fan Terminals for power supply of supply air fan Terminals for internal relative humidity/temperature sensor Analog input 1 —...
Commissioning | • Outdoor and exhaust air dampers and silencers are installed and that the duct system is correctly connected to the unit • All ducts are sufficiently insulated and installed according to local rules and regulations • Outdoor air intake is positioned with sufficient distance to pollution sources (kitchen ventilator exhaust, central vac- uum system exhaust or similar) •...
| Concluding Routines Concluding Routines Perform the following procedures before leaving the site: 1. Ensure that the product is operational and that no alarms are active. 2. If applicable, save the configuration backup. 3. Make sure that the Commissioning record is complete. 4.
EU Declaration of Conformity | EU Declaration of Conformity Manufacturer EN 60529 Systemair UAB Degrees of protection provided by enclosures (IP Code). Linų st. 101 EN 62233 LT–20174 Ukmergė, LITHUANIA Office: +370 340 60165 Measurement methods for electromagnetic fields of...
Page 18
Systemair UAB Linų st. 101 LT–20174 Ukmergė, LITHUANIA Phone +370 340 60165 Fax +370 340 60166 www.systemair.com...
Need help?
Do you have a question about the SAVE-P VTR 250/B and is the answer not in the manual?
Questions and answers