Download Print this page

BONTEC GWM01 Instruction Manual page 6

Monitor wall mount

Advertisement

You may need
assistance with this step.
Position arm assembly—
/wall plate [01] at your
desired height, level arm
assembly/wall plate [01]
fiF
and mark the pilot hole
locations.
Drill 3 pilot holes using a 3/8
in.(10mm) diameter drill bit. Make
sure the depth is not less than 2
23/64 in.(60mm). Never drill into the
mortar between
blocks.
Use the hammer to knock anchors
[w-c] into the wall. Be sure the
anchors [W-C] are seated flush
with the concrete surface.
(A
D
vou may need assis—
tance with this step.
Install arm assembly/wall plate [01]
using lag screws [W-A], washers [W-B]
and anchors [W-C]. Tighten the lag
screws [W-A] only until the washers
[w-B] are pulled firmly against the wall
plate. DO NOT over-tighten the lag
screws [W-A].
3/8 in.(10 mm)
Socket Wrench
(Not Included)
Step 4. Hang the Monitor to the Mount
2
You may need
assistance with this step.
Be sure to keep the arm in horizontal
position during adjustment. Or else, it
would be difficult to adjust the mount or
height by itself, no adjustment needed.
2. If the monitor rises up, press the arm to
keep it in horizontal position and then use
the Allen Key [T2] to turn the bolt clock-
wise("~" direction) to reduce tension of the
arm only until the monitor can stay at the
desired height by itself.
3. If the monitor falls down, lift the arm to
keep it in horizontal position and then use
the Allen Key [T2] to turn the bolt count—
er—clockwise ("+" direction) to increase
tension of the arm only until the monitor
can stay at the desired height by itself.
g e l Allen Key)
T
Y,
A\
T.
N
(Small Allen Key) }
1. Slightly loosen the pre—assembled bolt [S].
2. Adjust the monitor to your desired tilt angle.
3. re—tighten the bolt [S] to secure the monitor in place.
10

Advertisement

loading