Packing List And Installation Components - Sinclair SDV5 Installation & Owner's Manual

Full вс inverter systems
Hide thumbs Also See for SDV5:
Table of Contents

Advertisement

1.1
1.1

Packing list and installation components

 
1. Please check the packing list of the centralized controller,whether the components are
complete.
No.
Centralized controller
1
Cross-recessed head tapping
2
screws
Fastening plastic expansion pipe
3
Installation & Operation Manual
4
Matching
5
2. Installation assemblies prepared on the site
No.
Name
3-core control
1
shielded cable
3-core cable
2
Switch box
3
Wire pipe(jack
4
casing pipe,
captive nut)
Tighten strip
5
Installation & Owner's Manual
2
Name
resistance
Quantity
Selected model
(install into
wall)
2 PCS
RVVP-300/300 3×0.75mm
RVV-300/500 3×1.5mm 2
1 PCS
1 PCS
————
————
2/3 PCS
Several
————
pieces
Quantity
1
6
GB845/ST3.9*25-C-H(S)
6
Φ6*30
1
120 Ω
4
One for communicating with
the air conditioner; the other
2
for communicating with the
computer.
For power supply of the
centralized controller
For binding cables(as the
case maybe)
Remarks
Remarks
————
————

Advertisement

Table of Contents
loading

Table of Contents