Clearances - Access In Service - Potterton Assure Heat 13 Installation And Service Manual

Condensing central heating boiler
Hide thumbs Also See for Assure Heat 13:
Table of Contents

Advertisement

At least
1.5°
Fig. 9
At least
1.5°
Fig. 10
cupboard 300mm deep
120mm Min when over
surface 600mm deep
7684200-01 (06/17)
500mm Min
For Servicing
Purposes
270mm
5mm Min
In Operation
500mm Min
For Servicing
Purposes
5mm Min
In Operation
35mm Min when in
5mm Min
370mm
5mm Min
370mm
5.3.6

Clearances - Access in Service

1. A flat vertical area is required for the installation of the boiler.
2. These dimensions include the necessary clearances around
the boiler for case removal, spanner access and air movement
(Figs. 9 & 10). Additional clearances may be required for the
passage of pipes around local obstructions such as joists
running parallel to the front face of the boiler.
*These are MINIMUM recommended dimensions. Greater
clearance will aid installation and maintenance.
Before Installation
5
5mm Min
190mm
625mm
35mm Min*
in Cupboard
120mm Min*
5mm Min
35mm Min* in
cupboard (cut-outs
required for
pipework)
85mm Min* below
ceiling (allows
access to
compression
fittings on pipe)
625mm
35mm Min*
in Cupboard
120mm Min*
Assure Heat
29