RTI CS1200 Instructions And Operating Manual

RTI CS1200 Instructions And Operating Manual

Compressor installation direct driven

Advertisement

Quick Links

INSTRUCTION AND
OPERATING MANUAL
Compressor installation CS1200
direct driven

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CS1200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for RTI CS1200

  • Page 1 INSTRUCTION AND OPERATING MANUAL Compressor installation CS1200 direct driven...
  • Page 2 Preface This instruction and operating manual is required for compressor installations manufactured by the follow ing company: RTI Transport Installaties B.V. Albert Schw eitzerstraat 29 7131 PG Lichtenvoorde Tel. + 31 (0)544-377050 The manual provides information about the follow ing installation:...
  • Page 3: Table Of Contents

    General Qualification and training personnel Operating safety-conscious Safety instructions operator Modifications and repairing spare parts Modifications installation Mounting installation Mounting inst ructions RTI installation direct driven Start-up Maintenance installation Inspection during operation Weekly inspection Monthly inspection Half-yearly inspection Maintenance checklist - page 3 of 13 –...
  • Page 4: General

    (0031) 544-376499 Email: info@rti.nl Service facilities For addresses of service/technical support facilities, please visit our w ebsite www.rti.nl Technical data compressors Image 1.3.1 Image 1.3.2 - page 4 of 13 – Instruction and operating manual GHH CS1200 direct driven (for-030/031013)
  • Page 5: Oil Cooler

    Image 1.3.3 Oil cooler A GHH CS1200 is equipped w ith an integrated oil-cooler. If this oil-cooler is removed to save space, the installation is equipped w ith an external oil-cooler. An external oil-cooler is equipped w ith a 24 volt fan. The fan must be rotating during operation and therefor the functioning of the fan must be checked during operation.
  • Page 6: Safety

    Using foreign spare parts and accessories may entail the loss of any liability for the consequences arising therefrom. Modifications installation Without approval from RTI, it is not permitted to make any alterations to the installation. - page 6 of 13 – Instruction and operating manual GHH...
  • Page 7: Mounting Installation

    The vacuum valve has not been set w hen the installation is delivered as a building kit (w ithout mounting by RTI). - page 7 of 13 –...
  • Page 8: Start-Up

    The rotors of the compressor are sprayed w ith an anti-corrosion agent prior to delivery. During the initial operation this agent w ill evaporate as the compressor heats up. Since the RTI-installations are all tested a few minutes, the anti-corrosion agent on the rotors w ill have evaporated.
  • Page 9: Maintenance Installation

    If the installation is equipped w ith an external oil-cooler check if the control light is on (image 3.1.2). You w ill find the safety fuse in the sw itch box. - page 9 of 13 – Instruction and operating manual GHH CS1200 direct driven (for-030/031013)
  • Page 10: Weekly Inspection

    If the installation is equipped w ith an external oil-cooler check if the control light is on (image 3.1.2). You w ill find the safety fuse in the sw itch box. - page 10 of 13 – Instruction and operating manual GHH CS1200 direct driven (for-030/031013)
  • Page 11: Monthly Inspection

    If the installation is equipped w ith an external oil-cooler check if the control light is on (image 3.1.2). You w ill find the safety fuse in the sw itch box. - page 11 of 13 – Instruction and operating manual GHH CS1200 direct driven (for-030/031013)
  • Page 12: Halfyearly Inspection

    Maintenance/inspection list Along w ith every maintenance inspection the maintenance checklist on the next page must be filled out. We recommend sending the checklist to RTI after filling it out. Mail: info@rti.nl Fax: (0031) 544-376499 Hold on to the checklist, the checklist can be handed to the mechanic w hen the next maintenance service is due or w hen the installation needs to be repaired.
  • Page 13: Maintenance Checklist

    O -- Check pressure valve for 2.5 bar O -- Check functioning of indicators O -- Check the engine for unusual sounds O -- Clean the w indow pane - page 13 of 13 – Instruction and operating manual GHH CS1200 direct driven (for-030/031013)