7 OPERATION
7.1 Transfer to M aintenance Bypass
To transfer to maintenance bypass (mains) from UPS, use the following steps:
1.
Ensure the Mains lamp (amber) is illuminated. If the lamp is not illuminated, refer to
2. Transfer the rotary switch from UPS to MAINS, provided the Mains lamp is illuminated on the Liebert MicroPOD.
3. Turn the UPS off.
4. Disconnect the two cables connecting the UPS to the Liebert MicroPOD.
5. The UPS is prepared for servicing.
V ertiv | Vertiv Liebert® MicroPOD ™ Installer/User Guide |
Troubleshooting
on page 15.
12