Page 1
delta performance / 35 / 45 / 55 / F35 / F45 / F55 performance / G35 / G45 / G55 INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS excellence in hot water 16/12/2004 - 664Y0001...
Page 2
Electrical burners connection OIL BURNER CHARACTERISTICS Description Setting oil burner parametres GAS BURNER CHARACTERISTICS ACV BG 2000-S Air/Gas premix gas burner Setting gas burner parametres Gas categories COMMISSIONING AND MAINTENANCE Filling the hot water and heating circuits Using the boiler for the first time...
WARNINGS WHO SHOULD READ THESE INSTRUCTIONS APPLICABLE STANDARDS The products described in this document have been certified at These instructions should be read by: European level “CE” (European Directives 92/42/EEC “Efficiency”, - the specifying engineer 90/396/EEC “Gas devices”). They have be awarded the Belgian - the installer label “HR+”...
4 or 8 steel flue pipes with an inner diameter of 64 mm. Each pipe is fitted with a special steel baffle designed to • DELTA Performance 25, 35, 45 and 55 models - with effective improve heat exchange and reduce the flue gas temperature.
Page 5
INTRODUCTION Detachable casing cover (access to baffles) Control panel Chimney reducing pipe Manual reset high limit thermostat (103°C) Polyurethane foam insulation Bulb of the thermal reset high limit thermostat (95°C) Outer body containing the primary water Detachable front panel Control thermostat bulb Side casing Burner chamber plate Burner cover...
Page 6
This temperature should not exceed 90°C. If it does, stop the boiler and check the settings on the thermostat. If the problem persists, contact your installer for advice. 5 - ACV climatic controller (optional) Refer to the instructions supplied with the controller if you have this option.
INSTRUCTIONS BURNER SHUTDOWN If the oil burner is not working: If the gas burner is not working: 1. The burner indicator lamp lights. 1. Remove the protective burner cover. 2. Press the burner reset button on the burner. Now switch 2.
TECHNICAL CHARACTERISTICS GENERAL The appliances are supplied fully assembled, tested and packed standing on a timber base with impact protection strips and rapped in heat-shrunk plastic film. When the appliance arrives, remove the packaging and check that no parts have been damaged during shipment.
INSTALLATION BOILER ROOM Chimney connector type: B23 The chimney must be connected to the boiler by means of a metal Important pipe rising at an angle from the boiler to the chimney. It must be easily removable in order to give access to the flue pipes when •...
SAFETY GROUP the installation of The safety group of the water tank must be approved by ACV and a thermostatic calibrated to 7 bar; the group’s valve discharge must be connected mixer to prevent to the sewer.
INSTALLATION CONTROLLER KITS [OPTIONAL] KIT 1: ACV 13.00 / BASIC This basic kit is used to control the hot water circuit outlet temperature as a function of ambient conditions. It comprises: a temperature controller with analog clock, a surfacemounted primary water temperature sensor (-30/130°C), an outdoor sensor (-30/50°C), a servomotor SSY 319 230 V -...
ELECTRICAL CONNECTIONS ELECTRICAL BOILER CONNECTION N T1 T2 S3 B4 PRINCIPLE OF SUPPLY The boiler operates on a single-phase supply of 230 V/50 Hz. You should install a control box with main switch and 6 A fuses externally to the boiler to allow the boiler to be isolated from the supply for servicing and repairs.
Page 13
To fit out our Delta performance Oil boiler we needed a really high performance burner to give perfect combustion. We opted to use the brand new technology of the ACV BM R 31, BM R 51 y BM 101 burners.
GAS BURNER CHARACTERISTICS ACV BG 2000-S AIR/GAS PREMIX GAS BURNERS The air/gas premix BG 2000-S burner is fitted with a Honeywell The BG 2000-S burner is factory preset to gas valve, a venturi tube and an electrical control relay. The gas natural gas.
5. Allow the hot water circuit to discharge to the drain. RECOMMENDATION The drain cock (9) must be at ground level for the ACV recommends that you have the boiler serviced at least once circuit to drain fully. a year. Boiler servicing and checking must be carried out by a qualified engineer.