ACV BMR 33 Installation, Operating And Maintenance Instructions

Advertisement

BMR 33
Installation, operating
and maintenance instructions
EN • 1
662Y0500 • B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BMR 33 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ACV BMR 33

  • Page 1 BMR 33 Installation, operating and maintenance instructions EN • 1 662Y0500 • B...
  • Page 2: Table Of Contents

    Maintenance Flame monitoring troubleShooting Fault causes and solutions technical documentation Technical data and electrical supply Output table Oil line dimensions BMR 33 wiring diagram BMR 33 operating range Dimensions Guarantee Oil tank and oil lines Spare parts Spare partS www.ACv.COM...
  • Page 3: Safety Precautions

    Safety precautions Please read these installation instructions carefully before commencing any installation work. Liability and warranty claims will not be accepted for damage caused by failure to observe these installation instructions! Faulty installation may result in injuries or property damage! Working on the heating system: - Installation, commissioning, maintenance and repairs to the burner should be carried out only by an...
  • Page 4: General

    geneRal the flame makeS the difference energy SaVing Thanks to many years’ experience of developing blue burners, By purchasing this burner, you will be able to make significant we have been able to develop a product that not only meets, but savings in terms of costs, oil and above all, energy! far exceeds the sophisticated requirements of modern heating technology.
  • Page 5: Installation

    InStallatIon Specification Single-step switch with preheating and pre-purge, approved for intermittent operation in cast iron and steel boilers. Burner components: • Spiral housing (injection-molded) • Burner pipe (high-temperature resistant steel) • Sound-proofed combustion system with thermodynamic fuel-air mixing • Electric motor with operating capacitor •...
  • Page 6: Dimensions

    • Industrial applications Please seek our approval before using the burner in these applications! It is advisable to consult ACv in the event of increased load in the combustion chamber or increased thermal load. Do not allow contaminated combustion air to enter the...
  • Page 7: Commissioning

    CoMMISSIonIng commiSSioning and adjuStment Adjustment by a qualified technician is essential to obtain a permanently high combustion quality and operational safety. when the oil pre-heater is switched on, the burner starts up once the required temperature has been reached. Ignition and oil release occur automatically via the automatic oil firing device.
  • Page 8: Air Intake Nozzle Adjustment

    Gasket on the air intake sleeve Right view of burner Inspection opening for the flame detector. Do not obstruct. Alloy tube for BMR 33 with bayonet lock. The lock must engage, check during installation! BMR 33 flame tube neck with fixed recirculation Burner in service position for BMR 33 EN •...
  • Page 9: Maintenance

    MaIntenanCe maintenance It is advisable to have the oil firing system serviced annually by a competent engineer, if only to comply with statutory requirements. Cleaning the burner: Fan, mixing system, ignition device. Change the nozzle and drip stop if necessary, and the gasket on the mixing system. Then take measurements to check.
  • Page 10: Troubleshooting

    tRouBleShootIng Fault Cause Solution The burner starts, but there is Solenoid valve will not open Check electrical connections; replace solenoid no flame; It goes from running valve coil if necessary mode to fault mode Oil line blocked; nozzle blocked; Check specified components for blockages oil hoses blocked (filters etc.) Oil tank empty, oil pump defective...
  • Page 11 tRouBleShootIng Fault Cause Solution Burner starts, but here is no Sealing plugs not removed during initial Remove sealing plugs flame (lockout) and the inspection commissioning glass in the oil filter is only half full or empty Oil line not filled with oil during initial Fill oil line with oil during initial commissioning commissioning.
  • Page 12: Technical Documentation

    BMR 33 Power 22.5 Mains connection : 230v/50Hz Nozzle 0.50 - 80°S Max. recorded output : 185 w (BMR 33) Nozzle manufacturer Steinen Motor output : 90 w (BMR 33 Oil pressure Max. CO : 13.5 % Ø mm...
  • Page 13: Bmr 33 Operating Range

    Spare partS The oil burner will function correctly when installed and Use only original ACV replacement parts: commissioned by a competent technician provided that EL heating Some components, such as flame detectors, oil pumps, oil compliant with DIN 51 603, Part 1 is used.
  • Page 14 EN • 14 662Y0500 • B...