Wolf 10E Operation Instructions For Contractors page 23

Solar pump assembly
Hide thumbs Also See for 10E:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22
Operation instructions for contractors
GB
Solar pump assembly 10E / 20E
Connection dimensions
Installation location
Wall mounting
installation of the
connecting lines
Electrical connection
of the circulation pump
Filling and flushing the
system
3062506_202011
The solar pump assembly is to be installed in the solar return line.
- Take the solar pump assembly out of its packaging and remove the insulating
shells (2, 3).
- Mark drill holes (spacing between centres 262 mm), drill (Ø 8 mm) and fit the wall
plugs.
- Unclip the return branch (1) from the upper and lower wall mounting bracket (4)
- Mount the wall mounting bracket (4) using the screws provided
- Connect the rear insulating shell (3) over the wall mounting bracket
- Clip the return branch (1) back into the wall mounting bracket (4).
- Use clamping ring unions to fit the pipes of the solar heating system to the upper and
lower connections. Insert the pipe ends, cut off at right angles and deburred, as far
as they will go and use an open-ended spanner to firmly tighten the clamping ring
unions. Counter while tightening.
If copper tubes with a wall thickness of ≤ 1 mm are employed, in particular
Warning
soft copper tubes (rolled goods), support sleeves are to be used for additional
stabilisation of the pipes.
- Only specifically trained and qualified persons are permitted to work on electrical
components. Pass the connecting cable of the circulation pump through the insulation
and connect as described in the installation instructions for the solar control unit.
There is a possibility of destruction or perilous voltage on the device.
Do not fill the system in strong sunlight, or cover the collectors. There is a risk
of burns! Only use undiluted ANRO to fill the system. The addition of water or
other process media is not permissible. There is a danger of flocculation and
protection against frost and corrosion is no longer ensured. This can lead to the
complete failure of the system.
For filling and flushing the solar heating system we recommend the use of a filling and
flushing pump for at least 20 to 60 minutes! The flow velocity must be > 4 m/s in order
to be able to drag along air pockets and contamination. Manual venting can then be
dispensed with.
Wall mounting bracket top
Wall mounting bracket bottom
WOLF GmbH | 23

Advertisement

Table of Contents
loading

This manual is also suitable for:

20e2486312248631324863152486316

Table of Contents