Stark S-2000 Installation, Operation & Maintenance Instructions Manual

2 through 30

Advertisement

Quick Links

STARK® S-2000 2" through 30"
Installation, Operation & Maintenance Instructions
NOTE:
If a 24" to 30" closure was supplied with a screw top and/or load binder assist, please refer to 24" to 48"
S-2000 Closure IOM
GENERAL NOTICE
The information provided in this document is very important and needs to be shared with everyone involved
in the installing, operating and the maintenance of the closure(s).
SAFETY NOTICE
Do not open the closure unless you are sure there is no pressure within the closure. All operators should
use the appropriate Personal Protective Equipment (PPE) and operating tools.
WELDING NOTICE
During welding, warpage can occur due to the heat generated. Please read sections 1.3 & 1.4 for
recommendations to reduce warpage caused by welding. Excessive warpage will damage the product.
STARK® appreciates the support of all supervisors.
Should you have any questions or concerns not addressed in this document,
please contact us directly for assistance.
STARK® SOLUTIONS
10816 Northridge Drive
Conroe, TX 77303
936.539.2386
sales@starksolutions.com
www.starksolutions.com
STARK® SOLUTIONS IS ASME "U" & "R" & ISO 9001-2015 CERTIFIED

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S-2000 and is the answer not in the manual?

Questions and answers

Summary of Contents for Stark S-2000

  • Page 1 Should you have any questions or concerns not addressed in this document, please contact us directly for assistance. STARK® SOLUTIONS 10816 Northridge Drive Conroe, TX 77303 936.539.2386 sales@starksolutions.com www.starksolutions.com STARK® SOLUTIONS IS ASME “U” & “R” & ISO 9001-2015 CERTIFIED...
  • Page 2: Table Of Contents

    Table of Contents Section 1: INSTALLATION Page 03 Section 1.1: Installation of Horizontal Hinge Closure Page 03 Section 1.2: Attachment of the Closure Page 04 Section 1.3: Installation of Closure Hub in the Field (Manual Welding) Page 04 Section 1.4: Installation of Closure Hub in the Fabrication Shops (Automatic Welding) Page 05 Section 1.5: Final Tune Up Page 06...
  • Page 3: Section 1: Installation

    Section 1: INSTALLATION Section 1.1: Installation of Horizontal Hinged Closure NOTE: The lifting eye on the door is the preferred method of moving the closure, but should it be moved by hand, the handle on the door should be used. DO PULL THE CLOSURE WITH THE LATCH HANDLE.
  • Page 4: Section 1.3: Installation Of Closure Hub In The Field (Manual Welding)

    Section 1.3: Installation of Closure Hub in the Field (Manual Welding) A. Remove the Pressure Alert Valve (PAV), and O-ring from the closure hub. Ref. Figure 2 B. Fit the hub to the mating pipe/vessel. The use of internal or “spider” bracing is recommended, especially with thinner wall thicknesses closures.
  • Page 5: Section 1.4: Installation Of Closure Hub In The Fabrication Shops (Automatic Welding)

    IMPORTANT: During post weld heat treatment, it is recommended that it be accomplished by localized stress relieving. If that is not possible, the closure door and Clamp Ring must be removed prior to heat treatment. If this is required, contact Stark for the proper IOM with Door and Clamp Removal Instructions.
  • Page 6: Section 1.5: Final Tune Up

    Section 1.5: Final Tune Up Before placing the closure in service, all surfaces should be clean, with the O-ring and O-ring sealing surfaces covered with a thin film of light to medium lithium grease. The closure door face should be parallel to and concentric with the face of the hub.
  • Page 7: Section 2: Operation

    Section 2: OPERATION Section 2.1 Opening the S-2000 Closure IMPORTANT: A warning plate is attached to the latch handle on closures (Figure 7) and are also included on the closure nameplate on sizes 16” and larger (Figure 8). This warning concerns personal safety precautions and must be observed to prevent injury to personnel.
  • Page 8 IMPORTANT: When opening PAV, clamp ring, and door, always stand on the side of the closure that is opposite the door hinge. Do not stand in front of closure or on door hinge side of closure while opening. Figure 10. S-2000 PAV Figure 11. Lubricate the Clamp Ring Pivot Pin Document No: CMM.2000.106 Rev: 1...
  • Page 9: Section 2.2: Operation Instructions: Closing The Closure

    Spread Clamp Ring Figure 13. With Clamp Ring Spread Door Can Be Opened Section 2.2: Closing the S-2000 Closure A. Inspect, clean, and lubricate the O-ring, the O-ring grooves and sealing surfaces, and the PAV. Replace the O-ring if any damage is observed.
  • Page 10 D. Install the PAV. Make sure it is not cross threaded into the body. Tighten hand tight, and then add about one eighth of a turn with a small wrench. Do not over tighten. WARNING: Never attempt to pressurize the pipeline/vessel until you have made sure that the door, clamp ring, and PAV are fully closed and secured.
  • Page 11: Section 4: Door Adjustment

    Section 4: DOOR ADJUSTMENT After the door has been removed, it may need to be adjusted after being re-installed. Once the door is properly back in position, swing it toward the hub, stopping when contact is made. Check the height of the door versus the height of the clamp by inspecting the door OD and the hub OD at the same location and see if they are at the same height/position.
  • Page 12 • Left/Right – If the door is more left than the hub when almost closed, the door needs to be moved to the right side. Adjust both upper and lower lateral adjustments to the right, as equally as possible, and the door will adjust right. See Figure 17. •...
  • Page 13: Section 5: Maintenance

    • Lubricate the pivot point at the bottom of Clamp Section 5.2: O-ring Maintenance The S-2000 comes standard with a Viton O-ring that is placed on the closure hub, but it is always a good idea to ensure material compatibility with the product going through the pipeline. Should the O-ring material not be suitable, it could swell and prevent proper engagement of the clamps, thus not sealing properly.
  • Page 14: Section 5.3: Pav Maintenance

    • Ensure that all hinge points and pivot points are lubricated. • If excessive force has been used on the latch assembly, it is vital that all welds be visually inspected for defects. Should damage be present, please contact Stark Solutions immediately for support.
  • Page 15: Section 6: Reference Drawings

    SECTION 6: REFERENCE DRAWINGS Drawing 1. 4”-14” S-2000 HORIZONTAL CLOSURE Item No. Part Name DOOR CLAMP DOOR HANDLE LATCH HANDLE Document No: CMM.2000.106 Rev: 1 Version : 22.034...
  • Page 16 Drawing 2. 16”-30” HORIZONTAL S-2000 CLOSURE Item No. Part Name DOOR CLAMP DOOR HANDLE LATCH HANDLE ADJUSTMENT SCREWS BEARING HINGE POST ADJUSTMENT CAP GREASE SEAL SHAFT COLLAR Document No: CMM.2000.106 Rev: 1 Version : 22.034...