Figure 11:
Now it should be possible to see the streaming synchrophasor data. In the Graph tab, observe
the Frequency, data Reporting Rate, Phasor names, and Phase angles of the reported
synchrophasors. Observe the real-time frame details of the Data Frame in the bottom of the
window.
IEC140000139 V1 EN-US
Figure 12:
Open the drop-down menu in the
sent from the client (PMU Connection Tester) to the PMU. Try different commands and make
sure that the PMU is receiving and responding to them.
Commissioning manual
Verifying the TCP communication using PMU Connection Tester
Graphic view over streaming synchrophasor data
Establishing connection and verifying the IEEE C37.118/1344 communication
Command field. There is a list of commands that can be
IEC140000138-1-en.vsd
IEC140000139-1-en.vsd