Daikin ERLA11D V3 Series Installer's Reference Manual page 93

Hide thumbs Also See for ERLA11D V3 Series:
Table of Contents

Advertisement

ERLA11~16D + EBVH/X11+16S18+23D
Daikin Altherma 3 R F
4P643602-1B – 2022.05
a
d
a Front
b Side
c Rear
d Bottom
INFORMATION
a
b
Remove the knockout hole (a) in the bottom plate or cover plate by tapping on
the attachment points with a flat head screwdriver and a hammer.
Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
Avoid damaging the casing and underlying piping.
After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
3 Do the following:
▪ Connect the liquid pipe (a) to the liquid stop valve.
▪ Connect the gas pipe (b) to the gas stop valve.
4 Do the following:
c
b
b
b
a
b
b
a
8
Piping installation
|
Installer reference guide
93

Advertisement

Table of Contents
loading

Table of Contents