Fujitsu PRIMERGY TX1330 M3 Operating Manual page 77

Table of Contents

Advertisement

Ê Follow the on-screen instructions (see also section
server and installing the operating system with the ServerView
Installation Manager" on page 81
installing the operating system without the ServerView Installation
Manager" on page
– System already installed:
Ê Press the On/Off button (see item 12 in
The server is switched on, performs a system test and boots the
operating system.
Switching the server off
The power-on indicator lights up green (see item 11 in
Ê Shut down the operating system properly.
The server is switched off automatically and enters standby mode. The
power-on indicator lights up orange.
I
If the operating system does not switch off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
– Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC, you can configure that
the server is switched on/off controlled by timer.
– Ring indicator
The server is switched on by an internal or external modem.
– Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet
– After power failure
The server automatically reboots following a power failure (depending on the
settings in the BIOS or in iRMC).
TX1330 M3
or section
82).
Operating Manual
Starting up and operation
"Configuring the
"Configuring the server and
figure 7 on page
62).
figure 7 on page
62).
TM
).
77

Advertisement

Table of Contents
loading

Table of Contents