LG CordZero A9 K Owner's Manual page 14

Hide thumbs Also See for CordZero A9 K:
Table of Contents

Advertisement

14 INSTALLATION
3
Slide the detachable nozzle storage onto the
floor stand pipe.
• Make sure not to pinch or tangle the power
cord behind the mop pads storage.
4
Assemble the charging station onto the top of
the floor stand pipe.
5
Connect the power adapter to the port on the
back of the charging station.
6
Drill a hole in the wall and insert the drywall
anchor
if needed.
b
• Before drilling, make sure that there are no
pipes or electrical wires inside the wall at
the desired location.
• For drywall anchor: use 1/4" (6.5 mm) drill
bit
• For concrete or wall stud: use 1/8" (3 mm)
drill bit
• If screwing into drywall, use the drywall
anchor.
7
Align the wall anchoring block
chanrging station, and fix the charging station
to the wall by tightening the anchoring screw
all the way.
d
8
Plug the power cord into the power outlet.
Using Double-Sided Tape to Secure the
Appliance
1
Use the double-sided tape
wall anchoring block
station.
• Remove the center section of double-sided
tape before attaching it to the wall
anchoring block.
2
Attach the second piece of double-sided tape
to the other side of the wall anchoring block
to secure it to the wall.
• Do not use double-sided tape on wallpaper.
of the
c
to attach the
a
to the charging
b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents