Table of Contents

Advertisement

E2 Setup - Device and COMM
Figure 3-3 - E2 Network Setup

3.4.6 Conclusion

After all wiring is completed, power the transmitter and confirm operation, and then prepare to seal the
enclosure.
Align the enclosure gasket (primary transmitter and remote sensor if equipped), replace the lid, and tighten
the six (6) screws. Tightening torque should be limited to tightening by hand, and should be uniform in
pattern.
10

Advertisement

Table of Contents
loading

Table of Contents