Lochinvar EcoCharger ECH 32-220 G CE Installation, Commissioning, User & Maintenance Instructions page 118

Gas fired condensing water heater
Table of Contents

Advertisement

H
Hot water side............................. 56, 57
Hysteresis........................................ 79
I
Installation....................................... 53
Installation diagram...........................55
Installation, Maintenance and Service
part................................................. 41
Instructions on the water heater..........48
Interface.......................................... 19
Introduction................................ 15, 43
Isolate from the mains....................... 28
Isolating transformer......................... 66
L
Liability..............................................3
M
Main menu....................................... 29
Mains power..................................... 66
Maintenance..................................... 85
Maximum floor load........................... 53
Menu structure................................ 111
N
Notation conventions........................... 7
Notation conventions for menu-related
instructions...................................... 29
O
OFF................................................. 21
ON.................................................. 21
Operating cycle................................. 45
Operating modes...............................21
Operator interface........................19, 79
Optional electrical connections............ 66
116
P
Packaging.........................................53
PC connection................................... 20
Preface.............................................. 3
Preparation.......................................85
Preparation.......................................65
Pressure switch................................. 49
Procedure for checking the gas control
valve pressure.............................70, 70
Procedure for checking the supply
pressure...........................................68
PROG...............................................22
Program-controlled pump................... 66
Programming an extra period..............36
Protection for the water heater............49
R
Recycling......................................... 50
Regulations........................................ 4
S
Safety........................................ 17, 47
Safety devices.................................. 49
Safety instructions.............................47
Safety of the installation.....................50
Scope................................................ 7
Service conditions............................. 23
Service mode....................................82
Service program................................79
Setting day and time......................... 39
Setting legionella prevention............... 82
Setting menu language...................... 38
Setting the central heating configuration
...................................................... 83
Setting the service interval................. 81
Setting the water temperature............ 30
Setting the water temperature via the
SET POINT menu...............................30
Setting water temperature during ON
mode...............................................30
Settings........................................... 38
Settings........................................... 79
Starting and stopping the week program
...................................................... 31
Status of the water heater.................. 21
Switch the pump on or off.................. 81
Switching legionella prevention on and off
...................................................... 83
Installation, Maintenance and Service part

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents