Download Print this page

Advertisement

Quick Links

Service Manual
M-Vision CINE 400-3D
HTD-8650 QDPAA/AB/AC
HTD-8650 QDPBA/BB/BC

Advertisement

loading

Summary of Contents for M Vision CINE 400-3D

  • Page 1 Service Manual M-Vision CINE 400-3D HTD-8650 QDPAA/AB/AC HTD-8650 QDPBA/BB/BC...
  • Page 2: Serial (Rs-232) Interface Requirements

    1. Serial (RS-232) Interface Requirements The RS-232 connection parameters will be as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None Commands will use only ASCII characters which can be entered using a typical terminal emulator like Windows HyperTerminal. Spaces and tabs can be used to improve readability and will be ignored by the projector.
  • Page 3 For all but Execute functions the response from the projector will be the command and “= <value>” where <value> is the current value or “NA” if the value is not available. For Execute functions the response will be the same command. All responses will be in CAPS. See below for some operations command examples: Input: op bright? [CR] Response: OP BRIGHT = 100 [CR]...
  • Page 4 BRIGHTNESS 0-200 CONTRAST 0-200 SATURATION 0-200 0-200 SHARPNESS 0-200 0-200 Noise Reduction 0: Off OVERSCAN 1: Crop 2: Zoom 0: HDMI 1 1: HDMI 2 INPUT 2: Dub15 (RGB) 3: COMP1 (RCA) 4: COMP2 (BNC) RESYNC (execute) Re-lock the input signal 0: AUTO 1: Side-By-Side S3D.INPUTTYPE...
  • Page 5 0 = CRT 1 = Film GAMMA 2 = Video 3 = Punch 4 = Graphics 0: 5500K 1: 6500K COLOR.TEMP 2: 7500K 3: 9300K 4: Native 0 = Auto 1 = REC709 COLOR.GAMUT 2 = SMPTE C 3 = EBU 4 = Native 0: Off 1: On...
  • Page 6 0: Off AUTO.POWEROFF 1: On 0: Off AUTO.POWERON 1: On 0: Front Tabletop 1: Front Ceiling PROJ.MODE 2: Rear Tabletop 3: Rear Ceiling 0:disable the splash display when power startup LOGO.DISP 1:enable the splash display when power startup 0: Economy LAMP.POW 1: Standard 0: Screen (Def)
  • Page 7 LAMP.HOURS TOTAL.HOURS (Factory reset function in OSD menu for FACTORY.RESET (execute) user) 0: Off (Def) BLUE.ONLY 1: On 0: Auto (Def) ALTITUDE 1: High Current only reply the SOFT.VERSION get the software version NXP version. POWON (execute) Power the projector on POWOFF (execute) Power the projector off...
  • Page 8 PRERR (execute) Query the error log 3: for bootloader 4: for NXP Note: for firmware BOOTOP 9: for FPGA upgrade. 10: for FE FPGA 0 = Off 1 = White 2 = Black 3 = Red 4 = Green 5 = Blue 6 = Cyan PATTERN OSD pattern...
  • Page 9 0: Off DLP.CHECK 1: On Get thermal temperature value FAN1 Get/Set the FAN speed FAN2 Get/Set the FAN speed FAN3 Get/Set the FAN speed FAN4 Get/Set the FAN speed FAN5 Get/Set the FAN speed FAN6 Get/Set the FAN speed FAN7 Get/Set the FAN speed FAN8 Get/Set the FAN speed...
  • Page 10: Error Code & Troubleshooting

    2. Error Code & Troubleshooting 2-1. HTD-8650 QDPAA/AB/AC Error Code Inlet NTC thermal sensor is over temperature. OverTempInlet– Temp. is over spec. Check and replace Inlet thermal sensor – DMD NTC thermal sensor is over temperature. OverTempDMD Temp. is over spec. Check and replace DMD thermal sensor Ballast is over temperature.
  • Page 11 –– Fan2 locked, Fan2 get error during projector Fan2RatateError working. Check and replace fan 2 –– Fan3 locked, Fan3 get error during projector Fan3RatateError working. Check and replace fan 3. Fan4 locked, Fan4 get error during projector Fan4RatateError–– working. Check and replace fan 4. Fan5 locked, Fan5 get error during projector Fan5RatateError––...
  • Page 12 a). To check the power cable between Power BD and DMD BD. b). To check the 30 pins cable between Control BD and DMD BD. c). To check the 30 pins connector if the pin broken. – OSD load error. Check and replace the video OsdLoadError board, and then micro control board.
  • Page 13 2-2. HTD-8650 QDPBA/BB/BC Error Code Error Code Inlet NTC thermal sensor is over Lamp shut down while system is working temperature 3 Lamp 1 over temperature Ballast UART communication fail 7 Ballast 1 over temperature Lamp door was opened PCF8575 external GPIO communication fail, it can crash 20 Fans initial error when system power on system 21 Fan1 locked...
  • Page 14 – Inlet NTC thermal Inlet NTC thermal sensor is over temperature sensor is over temperature. Temp. is over spec. Check and replace Inlet thermal sensor – Lamp over temperature. Check and Lamp 1 over temperature replace Lamp1 thermal state a). To wait the cooling Mode finished. b).
  • Page 15 Micro controller BD. b). To check the Lamp c). To check the power cable of Ballast Lamp shut down while Lamp shut down while system is working– system is working. Check and replace lamp. a). To check the Lamp b). To check the fans Ballast UART communication Ballast UART communication fail–...
  • Page 16 board, and then micro control board. – F GENNUM SPI communication fail Scaler(GF9452) no response when system power on. Check and replace the video board.
  • Page 17 2-3. LED Indicator HTD-8650 QDPAA/AB/AC LED Indicator HTD-8650 QDPBA/BB/BC LED Indicator...
  • Page 18 2-4. RS-232 Retrieve Error Code Comment At first, please connect RS-232 cable between PC and projector, and then plug power cord. Then, please enter RS-232 system interface (Confirm your computer parameter setting is right, please refer to page 35. If it is not right, it can not connect with projector).
  • Page 19 Fan Rotational Speed HTD-8650 QDPAA/AB/AC Error Code Ambient <28C >35C FAN 1 DMD & Ballast Fan AFB0912M-AF00 1600 1700 1800 1900 2000 2100 2200 2300 FAN 2 Power Fan NFB1212M-F00 1000 1200 1300 1400 1500 1600 1650 1700 FAN 3 Lamp Burner Blower1 BFB0712HD-SE06 3200...
  • Page 20 HTD-8650 QDPBA/BB/BC Error Code Normal Table Ambient <28C >35C AFB0912H-AF00 1600 1800 2000 2200 2400 2600 2800 2800 FAN 1 DMD & Ballast Fan NFB1212M-F00 1000 1200 1300 1400 1500 1600 1650 1700 FAN 2 Power Fan BFB0712HD-SE06 3200 3200 3200 3200 3200 3200 3200 3200 FAN 3 Lamp Burner Blower1 AFB0812LD-SE21 2000 2150 2300 2450 2600 2700 2800 3000...
  • Page 21 AFB0912M-AF00 1600 1700 1800 1900 2000 2100 2200 2300 FAN 7 Front Exhaust Fan BFB0712HD-SE06 3200 3200 3200 3200 3200 3200 3200 3200 FAN 8 Lamp Burner Blower2 BFB0512HA-CF00 4000 4300 4600 4900 5200 5500 5800 6000 FAN 9 DMD front cooling ECO Table Ambient <28C...
  • Page 22: Firmware Download

    Firmware Download HTD-8650 QDPAA/AB/AC 4.1-1 How To Download Micro Control BD IC318(First Time) 1. First connect J200 from Power BD. 2. Connect CN304 from Keypad BD. 3. Connect RS-232 From PC. 4. Hold Power Key, and then plug in power cord. You can see the state, like the follow.
  • Page 23 Downloading Done 4.1-2 How To Download Micro Control BD IC318 (Re-download) 1. The unit is full set. 2. Connect RS-232. (Baud Rate is 9600) 3. Put file to flash Disk and plug into unit (The file name is must “Uboot.hex” at root directory)
  • Page 24 4. Plug in Power Cord. 5. You’ll see some massage like follow Key in “OP△BOOTOP△=△3” (△ is space) When you see “ACK:BOOTOP = 3”,you can unplug power cord. And plug power cord again. Don’t do anything at this time.
  • Page 25 Wait about 5 Second, you’ll see like follow. It’s means “Download OK” 4.2 How To Download Micro Control BD IC330 1. The unit is full set. 2. Connect RS-232. (Baud Rate is 9600) 3. Put file to flash Disk and plug into unit (The file name is must “App01.bin”...
  • Page 26 4. Plug in Power Cord. 5. You’ll see some massage like follow Key in “OP△BOOTOP△=△4” (△ is space) When you see “ACK:BOOTOP = 4”,you can unplug power cord. And plug power cord again. Don’t do anything at this time.
  • Page 27 Wait about 20 Second, you’ll see like follow. It’s means “Download OK” 4.3 How To Download Video BD IC626 1. The unit is full set. 2. Connect RS-232. (Baud Rate is 9600) 3. Key in “op△powon” to power on. 4. Key in “op△dlgf” to switch DB9 to Gennum.
  • Page 28 5. Close Tera Term, and select file to download. And You’ll see like follow.
  • Page 29 Note: If Can’t find comport like follow. You can modify something. First please check com port of your computer. And then you can modify something like follow. Click Right key at mouse at “ProgramApp02.bat” And choose “編輯” You can modify like follow,the space is for setting Com port.
  • Page 30 4.4 How To Download DMD BD IC76 1. The unit is full set. 2. Connect RS-232. (Baud Rate is 9600) 3. Put file to flash Disk and plug into unit (The file name is must “key3d.bin at root directory) 4. Plug in Power Cord. 5.
  • Page 31 Don’t do anything at this time. Wait about 110 second, you’ll see like follow. It’s means “Download OK”...
  • Page 32 4.5 How To Download DMD BD U18/U19 1.Make Jig Remove CN1 & CN2 And Check J6 Pin1,2,3 is 12V, Pin4,5,6 is GND.
  • Page 33 Run DLP Composer and check state. If state is fine click “Flash Loader” select file Click “Reset Bus” Click “Start Download”...
  • Page 35 HTD-8650 QDPBA/BB/BC 4.1-1 How To Download Micro Control BD IC318(First Time) 1. First connect J200 from Power BD. 2. Connect CN304 from Keypad BD. 3. Connect RS-232 From PC. 4. Hold Power Key, and then plug in power cord. You can see the state, like the follow. 5.Run Flash Magic Application, and setting like follow.
  • Page 36 Downloading Done 4.1-2 How To Download Micro Control BD IC318 (Re-download) 6. The unit is full set. 7. Connect RS-232. (Baud Rate is 9600) 8. Put file to flash Disk and plug into unit (The file name is must “Uboot.hex” at root directory)
  • Page 37 9. Plug in Power Cord. 10. You’ll see some massage like follow Key in “OP△BOOTOP△=△3” (△ is space) When you see “ACK:BOOTOP = 3”,you can unplug power cord. And plug power cord again. Don’t do anything at this time.
  • Page 38 Wait about 5 Second, you’ll see like follow. It’s means “Download OK” 4.2 How To Download Micro Control BD IC330 6. The unit is full set. 7. Connect RS-232. (Baud Rate is 9600) 8. Put file to flash Disk and plug into unit (The file name is must “App01.bin”...
  • Page 39 9. Plug in Power Cord. 10. You’ll see some massage like follow Key in “OP△BOOTOP△=△4” (△ is space) When you see “ACK:BOOTOP = 4”,you can unplug power cord. And plug power cord again. Don’t do anything at this time.
  • Page 40 Wait about 20 Second, you’ll see like follow. It’s means “Download OK” 4.3 How To Download Video BD IC26 6. The unit is full set. 7. Connect RS-232. (Baud Rate is 9600) 8. Key in “op△powon” to power on. 9. Key in “op△dlgf” to switch DB9 to Gennum.
  • Page 41 10. Close Tera Term, and select file to download. And You’ll see like follow. Note: If Can’t find comport like follow. You can modify something.
  • Page 42 First please check com port of your computer. And then you can modify something like follow. Click Right key at mouse at “ProgramApp02.bat” And choose “編輯” You can modify like follow,the space is for setting Com port. 4.4 How To Download FORMATTER BD IC76 6.
  • Page 43 When you see “ACK:BOOTOP = 9,you can unplug power cord. And plug power cord again. Don’t do anything at this time.
  • Page 44 Wait about 110 second, you’ll see like follow. It means “Download OK” 4.4.4 How To Download Video BD U11 1. The unit is full set. 2. Connect RS-232. (Baud Rate is 9600)
  • Page 45 3Put file to flash Disk and plug into unit (The file name is must “fefpga.bin” at root directory) 4.Plug in Power Cord. 5.You’ll see some massage like follow Key in “OP△BOOTOP△=△10 (△ is space)
  • Page 46 When you see “ACK:BOOTOP = 10”,you can unplug power cord. And plug power cord again. Wait few times, and then you’ll see some massage It means “Download OK” 4.5 How To Download FORMATTER BD U18/U19 1.Make Jig...
  • Page 47 Remove CN1 & CN2 And Check J6 Pin1,2,3 is 12V, Pin4,5,6 is GND. Run DLP Composer and check state.
  • Page 48 If state is fine click “Flash Loader” select file...
  • Page 49 Click “Reset Bus” Click “Start Download”...
  • Page 50 4.6 Ballast Download First, please prepare Philp Ballast Download Jig. USB Port connect to PC , another way connect to ballast. You can find com port in your PC, when you plug in USB...
  • Page 51 The PC need install “Waveshaper4.0”. Double Click the file what you want. Click “Convert & Program” and Click “Program to Driver”...
  • Page 52 4.7 Firmware download procedure for RJ-45(Micro Control BD) IC315 1. Connect the AC power of the projector and powon on projector 2. Connect the RJ-45 cable between the projector and the PC. And make sure that the two LEDs of the RJ-45 module are lit after connecting the RJ-45 cable between the PC and the projector.
  • Page 53 4. Key in the projector IP on the web browser (the recommended web browser is IE 6.0 or later version, the default IP is 192.168.0.100) to see the embedded webpage. 5.Make sure the DHCP is “Disable”, if current state is “Enable”, switch it to “Disable”...
  • Page 54 6. Key in the IP address and followed by “/firmwareUpdate.htm” on the URL box as below to activate the firmware update procedure http://192.168.0.100/firmwareUpdate.htm And click the “Update” button to start the firmware upgrade process. 7. The following message will be shown on the display, click “Continue” button to proceed...
  • Page 55 8. Press the “Browse” button and locate the firmware (binary code) to be upgraded. Then press the “Upgrade” button to proceed the download process. 9. Wait until the firmware upgrade process finished.
  • Page 56 10. Wait about 10 sec, you can connect “192.168.0.100”. When It show that is right version, it download OK...
  • Page 57 5. Key Module Disassembly and Replacement (M-Vision CINE 400-3D)  TOP COVER MODULE Step 1: Put the projector on the table. Step 2: Loosen 3 pcs screws on the rear side of Top cover.
  • Page 58 Step 3: Open the top cover and unplug the keypad connector. Step 4: Take off the top cover to put on the table.
  • Page 59 Step 5: Confirm the every connector position and wire dressing from the projector.
  • Page 60  BACK COVER MODULE Step 1: Loosen 13 pcs screws on the rear cover. Step 2: Unplug connector of IR Board from Rear cover. Step 3: Unplug connector of Interlock Board from Rear cover, and then remove Rear cover. Step 2: Unplug the rear IR connector from rear cover.
  • Page 61 Step 3: Take off the rear cover to put on the table.
  • Page 62  LEFT COVER MODULE Step 1: Loose the 7 pcs screws on the left side cover. Step 2: Take off the left side cover.
  • Page 63  RIGHT COVER MODULE Step 1: Loose the 3 pcs screws on the right side cover. Step 2: Take off the right side cover.
  • Page 64  CONTROL MODULE (Control Board & Video Board) Step 1: Loose the 2 pcs grounding screws on the bracket. And, then unplug 2 pcs connectors from the DMD board.
  • Page 65 Step 2: Loose the 2 pcs grounding screws on the Fan6 and take off Step 3: Unplug 2 pcs connectors form DMD board.
  • Page 66 Step 4: Loose the 2 pcs screws on the control module. Step 5: Loose the 3 pcs screws on the control module and bracket.
  • Page 67 Step 6: Loose the 2 pcs screws on the control module and bracket. Step 7: Take off the control module.
  • Page 68 Step 8: Unplug 2 pcs connectors from the control module. Step 9: Loose the 10 pcs screws on the I/O terminals of control module.
  • Page 69 Step 10: Loose the 2 pcs screws on the bottom of control module. Step 11: Loose the 2 pcs screws on the control module.
  • Page 70 Step 12: Loose the 5 pcs screws on the control module.
  • Page 71 Step 13: Take off the control board from video board. Please kindly be carefully board to board connectors.
  • Page 72 Step 14: Loose the 5 pcs inner hexagon screws and 2 pcs screws on the video board. And, then take off the video board.
  • Page 73  POWER & BALLAST Step 1: Confirm the every wire buckle before taking off the power and ballast board.
  • Page 74 Step 2: Confirm the every wire buckle before taking off the power and ballast board.
  • Page 75 Step 3: Loose the 4 pcs screws and unplug 3 connectors to take off the ballast.
  • Page 76 Step 4: Loose the 4 pcs screws and unplug 4 connectors to take off the power board.
  • Page 77  DMD BOARD Step 1: Pull out the iron latch and unplug 3 connectors.
  • Page 79 Step 2: Loose 1 screw on DMD Board Module.
  • Page 80 Step 3: Loose 4pcs screws of DMD BOARD ASSY, and then take out DMD BOARD ASSY.
  • Page 81 Step 4: Take DMD Module cover out and remove it.
  • Page 82 Step 5: Loose 6pcs screws and unplug 2 connectors to take out DMD board.